Osterild Wind Farm Testing Center

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: SG 14-222 DD, SG-DD-193 Wind Turbine

Osterild Wind Farm Testing Center is an operating wind farm in North Denmark Region, Denmark.

Project Details

Table 1: Phase-level project details for Osterild Wind Farm Testing Center

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
7 Operating[1] 2021[1] 14 MW[1] Onshore[1] Siemens Gamesa Renewable Energy SA[1] Technical University of Denmark (DTU)[2]
8 Operating[3] 2020[3] 10 MW[3] Onshore[3] Siemens Gamesa Renewable Energy SA[4] Technical University of Denmark (DTU)[4]

Location

Table 2: Phase-level location details for Osterild Wind Farm Testing Center

Phase Name Location Coordinates (WGS 84)
7 North Denmark Region, Denmark[3] 57.0465, 8.8834 (exact)[3]
8 North Denmark Region, Denmark[3] 57.0465, 8.8834 (exact)[3]

The map below shows the exact locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://www.offshorewind.biz/2021/10/27/siemens-gamesa-installs-14-mw-wind-turbine-nacelle-prototype/. {{cite web}}: Missing or empty |title= (help)
  2. https://windenergy.dtu.dk/english/research-infrastructure/oesterild. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 "Data for eksisterende og afmeldte anlæg". Energistyrelsen (The Danish Energy Agency). January, 2022. Archived from the original on February 1, 2022. Retrieved 4 February 2022. {{cite web}}: Check date values in: |date= (help)
  4. 4.0 4.1 (PDF) https://ens.dk/sites/ens.dk/files/Globalcooperation/report_on_oesterild_test_centre_-_lessons_learned.pdf. {{cite web}}: Missing or empty |title= (help)