Otter Creek wind farm (United States)
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Ecogrove Phase 3
Otter Creek wind farm (United States) is an operating wind farm in LaSalle County, Illinois, United States.
Project Details
Table 1: Phase-level project details for Otter Creek wind farm (United States)
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2020[1] | 150 MW[1] | Onshore[2] | Avangrid Renewables [100%][3] | Avangrid Renewables[4] |
Location
Table 2: Phase-level location details for Otter Creek wind farm (United States)
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | LaSalle County, Illinois, United States[1] | 41.1409, -88.7048 (exact)[1] |
The map below shows the exact location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ Hoen, B.D., Diffendorfer, J.E., Rand, J.T., Kramer, L.A., Garrity, C.P., and Hunt, H.E. (2018-04-19). "US Wind Turbine Database (v4.0, (April 9, 2021): U.S. Geological Survey, American Clean Power Association, and Lawrence Berkeley National Laboratory data release". United States Wind Turbine Database. Archived from the original on 2021-12-03. Retrieved 2021-04-09.
{{cite web}}
: CS1 maint: multiple names: authors list (link) - ↑ https://web.archive.org/web/20211106021027/https://www.avangridrenewables.com/wps/portal/aren/home/search/%21ut/p/z1/lVPBcoIwFPyWHnrEFycRw5FxrExbnWJFTS4MhkxNW4hglPr3DdheaoUxk0smb7P79m2Awxp4nhzVW2KUzpNPe2bcjXF_Og7ICM2oj30UPuGFR2dhQB9cWLUU9F8IBt6OXwIHLnKzM1tgSSnzeKszeY_2MinFtr7c60Mp5EjnRuZmplPZyQh8J1QKTHjIxSklTt-T1CEpEg4Vm42TYkoHG3eIMR42DA1XXBxkeQKmjZFla1-N8LovdGX56AI_JR4KCX6OJpPlxD7U5csZ30LQied_Si4VdPXAW0gap5kVObyuYgCro5IVRLkuMxum1_rFSmS9s-G9H8OLw6_pN09uNZrGYTSeWyE3x4T9N_YAwWOXtfZPqPei4L4Nbk33ZWB9mdxdFmUU231SyvmY02oRZLQKCGf-3TcQ57L_/?1dmy=&mapping=%2Faren%2Fhome%2Fsearch&urile=wcm%3Apath%3A%2FAREN_PressRoom%2FPressRoom%2FPressReleases%2F2020%2FAVANGRID%2BANNOUNCES%2BRETIREMENT%2BOF%2BCEO%2BJAMES%2BP.%2BTORGERSON. Archived from the original on 06 November 2021.
{{cite web}}
: Check date values in:|archive-date=
(help); Missing or empty|title=
(help) - ↑ "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help)