Overland Pass NGL Pipeline
From Global Energy Monitor
| Part of the Global Oil Infrastructure Tracker, a Global Energy Monitor project. |
| Related categories: |
Overland Pass NGL Pipeline is an operating NGL (natural gas liquids) pipeline in the United States.[1]
Location
The pipeline runs from Opal, Wyoming to Conway, Kansas.[1]
Project details
- Operator: Williams Companies[1]
- Owner: Overland Pass Pipeline Company LLC[1]
- Parent company: Williams Companies (50%), ONEOK, Inc. (50%)[1]
- Capacity: 245,000 bpd (barrels per day)[1]
- Length: 760 miles[1]
- Diameter: 16 inches[2]
- Status: Operating
- Start year: 2008[2]
- Cost:
- Financing:
- Associated infrastructure: Elk Creek NGL Pipeline, Bakken NGL Pipeline[3]
Background
The joint venture Overland Pass Pipeline Company was established by partners Williams Companies and ONEOK in 2006.[1]
Expansion projects
Extension 1
The extension runs from Echo Springs, Wyoming to Willow Creek, Colorado.
- Operator: Williams Companies[1]
- Owner: Overland Pass Pipeline Company LLC[1]
- Parent company: Williams Companies (50%), ONEOK, Inc. (50%)[1]
- Capacity:
- Length: 150 miles[1]
- Diameter:
- Status: Operating[1]
- Start year:
- Cost:
- Financing:
Extension 2
The extension runs from Keota, Colorado, to Wattenberg, Colorado.
- Operator: Williams Companies[1]
- Owner: Overland Pass Pipeline Company LLC[1]
- Parent company: Williams Companies (50%), ONEOK, Inc. (50%)[1]
- Capacity:
- Length: 124 miles[1]
- Diameter:
- Status: Operating[1]
- Start year:
- Cost:
Articles and resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 "Overland Pass Pipeline". Williams Companies. Retrieved 2025-01-30.
- ↑ 2.0 2.1 Carmen (2021-10-29). "Overland Pass NGL pipeline, the US". Offshore Technology. Retrieved 2025-01-30.
- ↑ "Recent Growth Projects". www.oneok.com. Retrieved 2025-01-30.