Pétalo Del Córdoba solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Pétalo Del Córdoba solar farm (Planta Solar Pétalo Del Córdoba) is an operating solar photovoltaic (PV) farm in Planeta Rica, Cordoba, Colombia.

Project Details

Table 1: Phase-level project details for Pétalo Del Córdoba solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
Alejandría Operating[1] 2024[2] 9.9 MWac[3] PV[4] Green Yellow Energia De Colombia SAS[5] Black Orchid Solar[4]
GY Solar Aurora Operating[4] 2020[3] 9.9 MWac[3] PV[4] Green Yellow Energia De Colombia SAS[5] Green Yellow Clim Solar[4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Pétalo Del Córdoba solar farm

Phase Name Location Coordinates (WGS 84)
Alejandría Planeta Rica, Cordoba, Colombia[6] 8.3592, -75.5753 (exact)[6]
GY Solar Aurora Planeta Rica, Cordoba, Colombia[7] 8.3558, -75.5401 (approximate)[7]

The map below shows the locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. "Colombia, Sistema de Informacion Eléctrico Colombiano (SIEL), Informe de Registro de Proyectos de Generación de Energía Eléctrica, 2020". Informe de Registro de Proyectos de Generación de Energía Eléctrica. Archived from the original on 2024-01-25. Retrieved January 4, 2021.
  2. https://www.pv-magazine-latam.com/2024/04/17/greenyellow-conecta-en-colombia-el-parque-solar-alejandria-de-143-mwp/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.
  4. 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240201163459/https://www1.upme.gov.co/siel. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://greenyellow.co/la-francesa-greenyellow-impulsa-el-progreso-en-el-departamento-de-cordoba-al-conectar-el-parque-solar-alejandria-un-proyecto-que-genero-mas-de-350-empleos-en-la-zona/ https://greenyellow.co/descubre-como-el-parque-gy-solar-aurora-genera-beneficios-ambientales-a-colombia/, https://greenyellow.co/la-francesa-greenyellow-impulsa-el-progreso-en-el-departamento-de-cordoba-al-conectar-el-parque-solar-alejandria-un-proyecto-que-genero-mas-de-350-empleos-en-la-zona/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  6. 6.0 6.1 https://maps.app.goo.gl/jjHzS66Mdh3XuBUW6 https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx, https://maps.app.goo.gl/jjHzS66Mdh3XuBUW6. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  7. 7.0 7.1 https://maps.app.goo.gl/oBHDQHzSBtyoGCZB7. {{cite web}}: Missing or empty |title= (help)