Pétalo Del Córdoba solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Pétalo Del Córdoba solar farm (Planta Solar Pétalo Del Córdoba) is an operating solar photovoltaic (PV) farm in Planeta Rica, Cordoba, Colombia.
Project Details
Table 1: Phase-level project details for Pétalo Del Córdoba solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
Alejandría | Operating[1] | 2024[2] | 9.9 MWac[3] | PV[4] | Green Yellow Energia De Colombia SAS[5] | Black Orchid Solar[4] |
GY Solar Aurora | Operating[4] | 2020[3] | 9.9 MWac[3] | PV[4] | Green Yellow Energia De Colombia SAS[5] | Green Yellow Clim Solar[4] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Pétalo Del Córdoba solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
Alejandría | Planeta Rica, Cordoba, Colombia[6] | 8.3592, -75.5753 (exact)[6] |
GY Solar Aurora | Planeta Rica, Cordoba, Colombia[7] | 8.3558, -75.5401 (approximate)[7] |
The map below shows the locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ "Colombia, Sistema de Informacion Eléctrico Colombiano (SIEL), Informe de Registro de Proyectos de Generación de Energía Eléctrica, 2020". Informe de Registro de Proyectos de Generación de Energía Eléctrica. Archived from the original on 2024-01-25. Retrieved January 4, 2021.
- ↑ https://www.pv-magazine-latam.com/2024/04/17/greenyellow-conecta-en-colombia-el-parque-solar-alejandria-de-143-mwp/.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 3.0 3.1 3.2 "Inscripción de proyectos de generación". SIEL. 2023. Archived from the original on 2024-01-25. Retrieved 2023-10-09.
- ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240201163459/https://www1.upme.gov.co/siel. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://greenyellow.co/la-francesa-greenyellow-impulsa-el-progreso-en-el-departamento-de-cordoba-al-conectar-el-parque-solar-alejandria-un-proyecto-que-genero-mas-de-350-empleos-en-la-zona/ https://greenyellow.co/descubre-como-el-parque-gy-solar-aurora-genera-beneficios-ambientales-a-colombia/, https://greenyellow.co/la-francesa-greenyellow-impulsa-el-progreso-en-el-departamento-de-cordoba-al-conectar-el-parque-solar-alejandria-un-proyecto-que-genero-mas-de-350-empleos-en-la-zona/.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 6.0 6.1 https://maps.app.goo.gl/jjHzS66Mdh3XuBUW6 https://www1.upme.gov.co/siel/Pages/Inscripcion-proyectos-generacion.aspx, https://maps.app.goo.gl/jjHzS66Mdh3XuBUW6.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 7.0 7.1 https://maps.app.goo.gl/oBHDQHzSBtyoGCZB7.
{{cite web}}
: Missing or empty|title=
(help)