PT Semen TonaKabupaten Pangkajene Dan Kepulauan Cement Plant

From Global Energy Monitor
This article is part of the
Global Cement and Concrete Tracker, a project of Global Energy Monitor.
Download full dataset
Report an error
Sub-articles:

PT Semen TonaKabupaten Pangkajene Dan Kepulauan Cement Plant is an integrated cement plant operating in Kabupaten Pangkajene Dan Kepulauan, Sulawesi, Indonesia.

Location

The map below shows the exact location of the cement plant in Kabupaten Pangkajene Dan Kepulauan, Sulawesi, Indonesia[1]:

Loading map...


Coordinates (WGS 84): -4.789565, 119.616409 (exact)[1]

Background

PT Semen Tonasa Cement Plant is the first cement company in Eastern Indonesia, a part of SIG (Semen Indonesia Group SMGR), also as state-owned enterprise and the largest cement producer in Indonesia[2]. The plant received ISO 50001 certification by achieving an energy efficiency of 18.52% and agricultural waste as renewable energy by 435,864.37 tons[2]. The plant was also selected as a UNESCO Global Geopark by reducing CO2 emissions by 435,864.37 tons[2].

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Cement Plant Details

Table 1: General Plant Details

Plant type Plant status Start date
integrated[1] operating[1] 1971[3]

Table 2: Ownership Details

Additional information including parent company references and full ownership trees available at the Global Energy Ownership Tracker.
Parent company Parent company GEM ID Owner name Owner company GEM ID
PT Semen Indonesia (Persero) Tbk [100.0%] E100000121067 [100.0%] PT Semen Tonasa [100.0%][1] E100002006367 [100.0%]

Table 3: Capacities (million metric tonnes per annum)

Cement capacity Clinker capacity
7.40[4] 5.60[5]

Table 4: Cement Production (million metric tonnes per annum)

Primary cement color Primary cement type Clinker substitution rate 2024 -2025 Cement production
grey[4] opc[4] 0–5% unknown

Table 5: Clinker Production

Clinker production method Number of operating kilns (accuracy) Number of developing kilns (accuracy) Kiln technology - preheater Kiln technology - precalciner Kiln technology - waste heat recovery
dry[6] 4 (exact)[7] unknown yes[8] unknown yes[9]

Table 6: Green Cement Technology

CCS/CCUS Alternative fuel Clay calcination
no yes; biofuel[7][4] no

Articles and Resources

Additional data

To access additional data, including an interactive map of Cement plants, a downloadable dataset, and summary data, please visit the Global Cement and Concrete Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 https://www.sementonasa.co.id/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 Iswahyudi; Mahesthi, Ari Nugraha Krisna Tri; Pramono, Agus Sidik; Rewah, Suzan Agustin; Sudarsih, Susi; Purnomo, Ridwan (2020). "Implementation of energy management system ISO 50001:2011 in Pt Semen Tonasa: Sharing experience". AIP Conference Proceedings. AIP Publishing. 2197: 030006. doi:10.1063/1.5140898.
  3. https://www.sementonasa.co.id/sejarah-perusahaan/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 (PDF) https://www.cleanenergyministerial.org/content/uploads/2023/06/cem-em-casestudy-sementonasa-indonesia.pdf. {{cite web}}: Missing or empty |title= (help)
  5. (PDF) https://www.sementonasa.co.id/wp-content/uploads/2019/02/SR-2016-English.pdf. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://ipen.org/sites/default/files/documents/ipen-rdf-pef-indonesia-v1_5aw-en.pdf. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://www.sementonasa.co.id/implementasi-afr/. {{cite web}}: Missing or empty |title= (help)
  8. https://maps.app.goo.gl/HbQ99xS1MvTQFHRC9. {{cite web}}: Missing or empty |title= (help)
  9. https://www.sementonasa.co.id/laporan-tahunan/#1675065524767-44ef3876-8c03. {{cite web}}: Missing or empty |title= (help)