Pagbilao Combined Cycle power station
| Part of the Global Oil and Gas Plant Tracker, a Global Energy Monitor project. |
| Related categories: |
Pagbilao Combined Cycle power station is a cancelled power station in Pagbilao, Quezon, Calabarzon, Philippines. It is also known as Grande Island, EWC CCGT Power Plant.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Pagbilao Combined Cycle power station | Pagbilao, Quezon, Calabarzon, Philippines | 13.8949, 121.752369 (exact)[1][2] |
Unit-level coordinates (WGS 84):
- 1: 13.8949, 121.752369
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Equipment | Emergency/Backup |
|---|---|---|---|---|---|---|---|
| 1 | Cancelled[3][4][5][6][7][8][9][10][11][12][13][14] | fossil gas: LNG[15] | 650[7][15] | combined cycle[15] | not found | Siemens Energy: SGT6-5000F, Siemens Energy: SGT6-5000F[16][7] | no |
CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| 1 | Energy World Corp Ltd [100%][15] | Energy World Corp Ltd [100.0%] |
Financing Details
Estimated project cost is approximately US$615 million, with a equity financing provided by Energy World Corp Ltd. A US$165 million loan package with Land Bank of the Philippines was allegedly closed in 2015, but as per Energy World Corp's 2018 annual report, it seems that it did not go ahead as some conditions were not fulfilled. Energy World's 2023 report mentions a different loan with the bank, and a term sheet was received, but the 2024 report does not provide specifics on this.[17][18]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon_Committed_30jun2024.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.google.com/maps/place/Energy+World+International,+Ltd.+LNG+Terminal/@13.8946943,121.7522844,1265m/data=!3m1!1e3!4m13!1m7!3m6!1s0x0:0x0!2zMTPCsDUzJzM1LjEiTiAxMjHCsDQ1JzEyLjEiRQ!3b1!8m2!3d13.89308!4d121.75336!3m4!1s0x33a2b6e5a8069149:0xc78fd7befc01c9c0!8m2!3d13.8930775!4d121.7555523.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20210608211434/https://www.philstar.com/business/2019/03/13/1900901/delay-energy-world-corp-power-plant-disrupts-does-supply-plan. Archived from the original on 2021-06-08.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://legacy.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed_6.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20230404074210/https://www.reuters.com/business/energy/philippines-greenlights-seventh-lng-project-gears-up-gas-imports-2023-01-27/. Archived from the original on 2023-04-04.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20221221061706/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/01-luzon_committed_lopsipp_31-august-202.pdf. Archived from the original (PDF) on 2022-12-21.
{{cite web}}: Missing or empty|title=(help) - ↑ 7.0 7.1 7.2 (PDF) https://www.aspecthuntley.com.au/asxdata/20240930/pdf/02859899.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20230506214727/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed%20-%202023-03-31.pdf. Archived from the original (PDF) on 2023-05-06.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20221224051452/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_committed_2022_mar-31.pdf. Archived from the original (PDF) on 2022-12-24.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://web.archive.org/web/20231004133449/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/private_sector_initiated_power_projects/01_Luzon-Committed-July-2023.pdf. Archived from the original (PDF) on 2023-10-04.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://company-announcements.afr.com/asx/ewc/0fea71ec-5e10-11f1-aee2-2a2ddbb2b0a7.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ https://www.listcorp.com/asx/ewc/energy-world-corporation-limited/news/annual-report-to-shareholders-3092488.html.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed_30aug2024.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ (PDF) https://legacy.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed_5.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 15.2 15.3 https://web.archive.org/web/20220811100737/http://www.energyworldcorp.com/projects.php. Archived from the original on 2022-08-11.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240724182957/http://www.cepa188.com/projects.php. Archived from the original on 2024-07-24.
{{cite web}}: Missing or empty|title=(help) - ↑ Energy World Corp Ltd. "2023 Annual Report." Accessed 17 September 2025. https://announcements.asx.com.au/asxpdf/20230929/pdf/05vjp3vkp5njp3.pdf
- ↑ Energy World Corp Ltd. "2024 Annual Report." Accessed 17 September 2025. https://www.aspecthuntley.com.au/asxdata/20240930/pdf/02859899.pdf