Pagbilao Combined Cycle power station is a cancelled power station in Pagbilao, Quezon, Calabarzon, Philippines. It is also known as Grande Island, EWC CCGT Power Plant.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Pagbilao Combined Cycle power station Pagbilao, Quezon, Calabarzon, Philippines 13.8949, 121.752369 (exact)[1][2]
Loading map...

Unit-level coordinates (WGS 84):

  • 1: 13.8949, 121.752369

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Equipment Emergency/Backup
1 Cancelled[3][4][5][6][7][8][9][10][11][12][13][14] fossil gas: LNG[15] 650[7][15] combined cycle[15] not found Siemens Energy: SGT6-5000F, Siemens Energy: SGT6-5000F[16][7] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 Energy World Corp Ltd [100%][15] Energy World Corp Ltd [100.0%]

Financing Details

Estimated project cost is approximately US$615 million, with a equity financing provided by Energy World Corp Ltd. A US$165 million loan package with Land Bank of the Philippines was allegedly closed in 2015, but as per Energy World Corp's 2018 annual report, it seems that it did not go ahead as some conditions were not fulfilled. Energy World's 2023 report mentions a different loan with the bank, and a term sheet was received, but the 2024 report does not provide specifics on this.[17][18]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Articles and Resources

References

  1. ↑ (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon_Committed_30jun2024.pdf. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://www.google.com/maps/place/Energy+World+International,+Ltd.+LNG+Terminal/@13.8946943,121.7522844,1265m/data=!3m1!1e3!4m13!1m7!3m6!1s0x0:0x0!2zMTPCsDUzJzM1LjEiTiAxMjHCsDQ1JzEyLjEiRQ!3b1!8m2!3d13.89308!4d121.75336!3m4!1s0x33a2b6e5a8069149:0xc78fd7befc01c9c0!8m2!3d13.8930775!4d121.7555523. {{cite web}}: Missing or empty |title= (help)
  3. ↑ https://web.archive.org/web/20210608211434/https://www.philstar.com/business/2019/03/13/1900901/delay-energy-world-corp-power-plant-disrupts-does-supply-plan. Archived from the original on 2021-06-08. {{cite web}}: Missing or empty |title= (help)
  4. ↑ (PDF) https://legacy.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed_6.pdf. {{cite web}}: Missing or empty |title= (help)
  5. ↑ https://web.archive.org/web/20230404074210/https://www.reuters.com/business/energy/philippines-greenlights-seventh-lng-project-gears-up-gas-imports-2023-01-27/. Archived from the original on 2023-04-04. {{cite web}}: Missing or empty |title= (help)
  6. ↑ (PDF) https://web.archive.org/web/20221221061706/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/01-luzon_committed_lopsipp_31-august-202.pdf. Archived from the original (PDF) on 2022-12-21. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 7.2 (PDF) https://www.aspecthuntley.com.au/asxdata/20240930/pdf/02859899.pdf. {{cite web}}: Missing or empty |title= (help)
  8. ↑ (PDF) https://web.archive.org/web/20230506214727/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed%20-%202023-03-31.pdf. Archived from the original (PDF) on 2023-05-06. {{cite web}}: Missing or empty |title= (help)
  9. ↑ (PDF) https://web.archive.org/web/20221224051452/http://www.doe.gov.ph/sites/default/files/pdf/electric_power/luzon_committed_2022_mar-31.pdf. Archived from the original (PDF) on 2022-12-24. {{cite web}}: Missing or empty |title= (help)
  10. ↑ (PDF) https://web.archive.org/web/20231004133449/https://www.doe.gov.ph/sites/default/files/pdf/electric_power/private_sector_initiated_power_projects/01_Luzon-Committed-July-2023.pdf. Archived from the original (PDF) on 2023-10-04. {{cite web}}: Missing or empty |title= (help)
  11. ↑ (PDF) https://company-announcements.afr.com/asx/ewc/0fea71ec-5e10-11f1-aee2-2a2ddbb2b0a7.pdf. {{cite web}}: Missing or empty |title= (help)
  12. ↑ https://www.listcorp.com/asx/ewc/energy-world-corporation-limited/news/annual-report-to-shareholders-3092488.html. {{cite web}}: Missing or empty |title= (help)
  13. ↑ (PDF) https://doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed_30aug2024.pdf. {{cite web}}: Missing or empty |title= (help)
  14. ↑ (PDF) https://legacy.doe.gov.ph/sites/default/files/pdf/electric_power/01_Luzon%20Committed_5.pdf. {{cite web}}: Missing or empty |title= (help)
  15. ↑ 15.0 15.1 15.2 15.3 https://web.archive.org/web/20220811100737/http://www.energyworldcorp.com/projects.php. Archived from the original on 2022-08-11. {{cite web}}: Missing or empty |title= (help)
  16. ↑ https://web.archive.org/web/20240724182957/http://www.cepa188.com/projects.php. Archived from the original on 2024-07-24. {{cite web}}: Missing or empty |title= (help)
  17. ↑ Energy World Corp Ltd. "2023 Annual Report." Accessed 17 September 2025. https://announcements.asx.com.au/asxpdf/20230929/pdf/05vjp3vkp5njp3.pdf
  18. ↑ Energy World Corp Ltd. "2024 Annual Report." Accessed 17 September 2025. https://www.aspecthuntley.com.au/asxdata/20240930/pdf/02859899.pdf

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.