Palembang Timur power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Palembang Timur power station is an operating power station of at least 150-megawatts (MW) in Perajen, South Sumatra, Indonesia.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Palembang Timur power station Perajen, South Sumatra, Indonesia -2.9268174, 104.8676653 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1: -2.9268174, 104.8676653

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 operating[2][3][4] fossil gas - natural gas[2][5] 150[2][5] combined cycle[6][7] 2004[2][5]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 PT Asrigita Prasarana [100.0%]

Articles and Resources

References

  1. https://www.google.com/maps/place/PT.Asrigita+Prasarana/@-2.9268174104.8676653783m/data=!3m2!1e3!4b1!4m5!3m4!1s0x2e3b7778c7e7f5fb:0x3ebae0f883903fc4!8m2!3d-2.9268228!4d104.869854. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 https://web.archive.org/web/20210311015320/https://www.industryabout.com/country-territories-3/2029-indonesia/fossil-fuels-energy/30986-palembang-timur-gas-power-plant. Archived from the original on 11 March 2021. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20220709131405/https://en.chengda.com/performanceInfo.aspx?id=41&pid=17&cid=14&page=2. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. https://web.archive.org/web/20220709132125/https://www.dcengineeringindonesia.com/en/news/overhaul-pltu-palembang-timur-1x150-mw/86. Archived from the original on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://web.archive.org/web/20221129082650/https://cepagram.com/index.php/2017/04/13/daftar-perusahaan-pembangkit-listrik-swasta-di-indonesia/. Archived from the original on 29 November 2022. {{cite web}}: Missing or empty |title= (help)
  6. (PDF) https://web.archive.org/web/20220709142915/https://openjicareport.jica.go.jp/pdf/11798659_01.pdf. Archived from the original (PDF) on 09 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. https://web.archive.org/web/20181111134328/http://bumn.go.id:80/pln/berita/20. Archived from the original on 11 November 2018. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.