Paracin - Prahovo Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

The Paracin to Prahovo Gas Pipeline is a proposed gas pipeline network in Serbia.[1]

Location

The pipeline runs from Paracin to Prahovo with branches to BOR, ZAJEČAR AND KNJAŽEVAC.

Project details

Main Line

  • Operator: Srbijagas
  • Owner: Srbijagas
  • Parent company:
  • Capacity:
  • Length: 239.0 km
  • Diameter: 500,80 mm
  • Status: proposed
  • Start Year:
  • Cost:
  • Financing:
  • Associated infrastructure:

Background

The earliest evidence for the proposal is from 2021.[2] The pipeline is set to being construction in 2027.[3] Preparation work to clear the pipeline route of unexploded mines will begin before construction.[4] It includes main line transmission pipelines as well as smaller distribution pipelines. The list of routes includes the following

  • MG 12 – section from Paraćin to Rgotina, about 81 km long;
  • MG 13 – section from Rgotina to Prahovo, about 51 km long;
  • RG 12-01 – section from Suva Reka to Bor, diameter DN250 and length about 4km;
  • RG 12-03 – section from Rgotina to Zaječar, about 7 km long;
  • RG 12-03/1 - section from Zaječar to Knjaževac, about 42 km long with a section via Svrljig to Niš (Pantelej) about 47 km long,
  • RG 12-04 - section of the gas pipeline to Zaječar, about 20 m long;
  • RG 13-01 – section of the gas pipeline for Rgotina, diameter DN80 and length about 0.5 km;
  • RG 13-03 - section of gas pipeline to Negotin, diameter DN150 and length about 30m

Articles and resources

References

{reflist}

  1. "Korak ka gasifikaciji istočne Srbije: prostorni plan predviđa gradnju 239 km gasovoda od Paraćina do Prahova". Borskenarodne. 2024. Retrieved 2025-09-11.
  2. "Ребаланс Програма пословања ЈП „Србијагас" за 2021. годину на дневном реду седнице Надзорног одбора". ЈП „Србијагас“. 2021-04-22. Retrieved 2025-09-11.
  3. "Полазне основе плана развоја енергетске инфраструктуре и мера енергетске ефикасности за период до 2028. са пројекцијама до 2030. године" (PDF). Министарство рударства и енергетике (Министарство рударства и енергетике Републике Србије). 2023. Retrieved 2025-09-11.
  4. "Обавештење ГУ Зајечар поводом дописа извођача радова на припреми терена за изградњу магистралног гасовода Параћин–Бољевац–Рготина–Неготин–Прахово, са одвојима Бор, Зајечар и Књажевац". Timocka. 2024. Retrieved 2025-09-11.