Paus Biru Gas Field (Indonesia)

From Global Energy Monitor
This article is part of the Global Oil and Gas Extraction Tracker, a Global Energy Monitor project.
Report an error
Related categories:

Paus Biru Gas Field is an in-development gas field in Indonesia.

Paus Biru Gas Field is a part of the Sampang Block Oil and Gas Project (Indonesia).

Project Details

Main Data

Table 1: Field-level project details for Paus Biru Gas Field

1Final Investment Decision
Unit name Status Operator Owner Discovery year FID1 year Production start year Production type
Paus Biru in-development[1] PT Medco Energi Internasional[2] Cue Energy [15%]; Singapore Petroleum Co Ltd [40%]; PT Medco Energi Internasional Tbk [45%][3][2][3][2][3][2] 2018[2] 2025[1] conventional[4]

Production and Reserves

Table 2: Reserves of Paus Biru Gas Field

million m³ = million cubic meters
Fuel description Reserves classification Quantity Units Data year Source
gas 2C 1271.43 million m³ 2020 [4]

Table 3: Production from Paus Biru Gas Field

million m³/y = million cubic meters per year
Category Fuel description Quantity Units Data year Source
production design capacity gas 232.56 million m³/y 2027 [5]

Location

Table 4: Field-level location details for Paus Biru Gas Field

Concession/Block Location Onshore/Offshore Coordinates (WGS 84)
Sampang[6] offshore, Indonesia[4] offshore[4] -7.2999, 113.4553 (approximate)[4]

The map below shows the approximate location of the field(s) within the Sampang Block Oil and Gas Project (Indonesia):

Loading map...

Articles and Resources

Additional Data

To access additional data, including an interactive map of oil and gas extraction sites, a downloadable dataset, and summary data, please visit the Global Oil and Gas Extraction Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 https://www.upstreamonline.com/field-development/indonesia-projects-advance-for-cue-energy/2-1-1861642. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20210727001959/https://connect.ihsmarkit.com/upstream-insight/article/phoenix/3889063/paus-biru-feed-in-early-stages. Archived from the original on 27 July 2021. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 https://web.archive.org/web/20240731153155/https://www.medcoenergi.com/en/download/download_file/?id=3615. Archived from the original on 31 July 2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20230328044210/https://www.offshore-technology.com/projects/paus-biru-field/. Archived from the original on 28 March 2023. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240710230224/https://www.upstreamonline.com/field-development/two-year-delay-on-cards-at-indonesian-offshore-project/2-1-1590257?zephr_sso_ott=YFxioe. Archived from the original on 10 July 2024. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20221225030501/https://www.thejakartapost.com/news/2020/08/27/medco-gets-green-light-for-80m-paus-biru-gas-project-reports-q1-loss.html. Archived from the original on 25 December 2022. {{cite web}}: Missing or empty |title= (help)