Pavant Solar 2

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Pavant Solar 2 is an operating solar photovoltaic (PV) farm in Millard County, Utah, United States.

Project Details

Table 1: Phase-level project details for Pavant Solar 2

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
2 Operating[1] 2016[1] 50 MWac[1] PV[1] Public Service Enterprise Group (PSEG) Solar Source [100%][2] Public Service Enterprise Group (PSEG) Solar Source[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Pavant Solar 2

Phase Name Location Coordinates (WGS 84)
2 Millard County, Utah, United States[1] 39.1620, -112.3560 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. ↑ 2.0 2.1 https://web.archive.org/web/20220207202556/https://www.power-eng.com/renewables/pseg-s-50-mw-pavant-solar-ii-project-in-utah-due-for-startup-in-sept/. Archived from the original on 07 February 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)