Pavant Solar 2
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Pavant Solar 2 is an operating solar photovoltaic (PV) farm in Millard County, Utah, United States.
Project Details
Table 1: Phase-level project details for Pavant Solar 2
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|---|
| 2 | Operating[1] | 2016[1] | 50 MWac[1] | PV[1] | Public Service Enterprise Group (PSEG) Solar Source [100%][2] | Public Service Enterprise Group (PSEG) Solar Source[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Pavant Solar 2
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 2 | Millard County, Utah, United States[1] | 39.1620, -112.3560 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.0 2.1 https://web.archive.org/web/20220207202556/https://www.power-eng.com/renewables/pseg-s-50-mw-pavant-solar-ii-project-in-utah-due-for-startup-in-sept/. Archived from the original on 07 February 2022.
{{cite web}}: Check date values in:|archive-date=(help); Missing or empty|title=(help)
