Pe-Na-Koam wind farm
From Global Energy Monitor
| This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Other names: Pe-Na-Koyim
Pe-Na-Koam wind farm is a wind farm in pre-construction in Kainai/Blood Tribe Reserve, Alberta, Canada.
Project Details
Table 1: Phase-level project details for Pe-Na-Koam wind farm
| Status | Commissioning year | Nameplate capacity | Type | Owner |
|---|---|---|---|---|
| Pre-construction[1] | 2028 (planned)[2] | 315 MW[2] | Onshore[1] | EDF Renewables; Kainaiwa Resources (KRI) (法國電力再生能源公司)[3] |
Location
Table 2: Phase-level location details for Pe-Na-Koam wind farm
| Location | Coordinates (WGS 84) |
|---|---|
| Kainai/Blood Tribe Reserve, Alberta, Canada[4] | 49.6174, -112.9518 (approximate)[4] |
The map below shows the approximate location of the wind farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://web.archive.org/web/20240125165246/https://iaac-aeic.gc.ca/050/evaluations/proj/84516. Archived from the original on 2024-01-25.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 "Pe-Na-Koyim Wind Project". Archived from the original on 2024-06-28. Retrieved 2024-06-24.
- ↑ https://iaac-aeic.gc.ca/050/evaluations/proj/84516utm_source=Renewables+Now_subscribers+and+newsletter&utm_campaign=3cdd8a2d5b-Renewables_Now_The_Daily_Newsletter_15_06_15_2017_&utm_medium=email&utm_term=0_990771841c-3cdd8a2d5b-259828526, https://renewablesnow.com/news/kainaiblood-tribe-seeks-off-takers-for-300-mw-wind-project-in-alberta-756369/, https://iaac-aeic.gc.ca/050/evaluations/proj/84516utm_source=Renewables+Now_subscribers+and+newsletter&utm_campaign=3cdd8a2d5b-Renewables_Now_The_Daily_Newsletter_15_06_15_2017_&utm_medium=email&utm_term=0_990771841c-3cdd8a2d5b-259828526 https://renewablesnow.com/news/kainaiblood-tribe-seeks-off-takers-for-300-mw-wind-project-in-alberta-756369/, https://iaac-aeic.gc.ca/050/evaluations/proj/84516utm_source=Renewables+Now_subscribers+and+newsletter&utm_campaign=3cdd8a2d5b-Renewables_Now_The_Daily_Newsletter_15_06_15_2017_&utm_medium=email&utm_term=0_990771841c-3cdd8a2d5b-259828526, https://renewablesnow.com/news/kainaiblood-tribe-seeks-off-takers-for-300-mw-wind-project-in-alberta-756369/, https://iaac-aeic.gc.ca/050/evaluations/proj/84516utm_source=Renewables+Now_subscribers+and+newsletter&utm_campaign=3cdd8a2d5b-Renewables_Now_The_Daily_Newsletter_15_06_15_2017_&utm_medium=email&utm_term=0_990771841c-3cdd8a2d5b-259828526.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help) - ↑ 4.0 4.1 https://www.edf-re.com/project/pe-na-koyim-wind-project/ https://iaac-aeic.gc.ca/050/evaluations/proj/84516, https://www.edf-re.com/project/pe-na-koyim-wind-project/.
{{cite web}}: Check|url=value (help); Missing or empty|title=(help)
