Peregrine Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Peregrine Solar is a solar photovoltaic (PV) farm under construction in Goliad County, Texas, United States.
Project Details
Table 1: Phase-level project details for Peregrine Solar
Status | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|
Construction[1] | 300 MWac[1] | PV[2] | Consolidated Edison Development Inc. [100%][3] | Consolidated Edison Development Inc.[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Peregrine Solar
Location | Coordinates (WGS 84) |
---|---|
Goliad County, Texas, United States[1] | 28.4279, -97.4544 (exact)[1] |
The map below shows the exact location of the solar farm:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.0 2.1 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help) - ↑ https://web.archive.org/web/20240206202619/https://solarbuildermag.com/news/cps-energy-finalizes-plans-for-300-mw-peregrine-solar/. Archived from the original on 2024-02-06.
{{cite web}}
: Missing or empty|title=
(help)