Perioche Sea Offshore wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Thrakiki Wind 1

Perioche Sea Offshore wind farm (Θαλασσια Περιοχη) is a wind farm in pre-construction in Alexandroupolis, Evros Regional Unit, Macedonia and Thrace, Greece.

Project Details

Table 1: Phase-level project details for Perioche Sea Offshore wind farm

Status Nameplate capacity Type Owner
Pre-construction[1] 216 MW[1] Offshore hard mount[1] Public Power Corporation SA [100%] (ΔΗΜΟΣΙΑ ΕΠΙΧΕΙΡΗΣΗ ΗΛΕΚΤΡΙΣΜΟΥ ΑΕ)[2]

Location

Table 2: Phase-level location details for Perioche Sea Offshore wind farm

Location Coordinates (WGS 84)
Alexandroupolis, Evros Regional Unit, Macedonia and Thrace, Greece[1] 40.8066, 25.8903 (exact)[1]

The map below shows the exact location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  2. ↑ "ΔΕΗ Ανανεώσιμες: Deal με ομίλους Κοπελούζου και Σαμαρά για υπεράκτιο αιολικό". Ημερησία. 2023-12-27. Archived from the original on 2024-04-25. Retrieved 2024-04-19.