Perm CHP-14 power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Perm CHP-14 power station (Пермская ТЭЦ-14) is an operating power station of at least 330-megawatts (MW) in Perm, Perm Krai, Russia with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Perm CHP-14 power station Perm, Perm Krai, Russia 58.018928, 55.881863 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit CC1: 58.018928, 55.881863

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year
Unit 1 operating[2][3] fossil gas - natural gas, fossil liquids - heavy fuel oil[4] 60[3][5] steam turbine[6] 1966[3] 2028 (planned)[2][7]
Unit 2 operating[3] fossil gas - natural gas, fossil liquids - heavy fuel oil[4] 35[3][8][5] steam turbine[6] 1967[3]
Unit 3 operating[3] fossil gas - natural gas, fossil liquids - heavy fuel oil[4] 50[3][8][5] steam turbine[6] 1967[8]
Unit 4 operating[3] fossil gas - natural gas, fossil liquids - heavy fuel oil[4] 135[3][5] steam turbine[6] 2008[3]
Unit 5 operating[2][8] fossil gas - natural gas, fossil liquids - heavy fuel oil[2] 50[8][5] steam turbine[8] 1979[8] 2028 (planned)[2][7]
Unit CC1 announced[9][7][10][11][12][2][13] fossil gas - natural gas[4] 105[9][14][5] combined cycle[14] 2028[5][9][7][2][15][16]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner
Unit 1 T Plus PJSC Perm Branch [100.0%]
Unit 2 T Plus PJSC Perm Branch [100.0%]
Unit 3 T Plus PJSC Perm Branch [100.0%]
Unit 4 T Plus PJSC Perm Branch [100.0%]
Unit 5 T Plus PJSC Perm Branch [100.0%]
Unit CC1 T Plus PJSC Perm Branch [100.0%]

Background

Planned retirements

According to the Ministry of Energy (Minenergo) energy program for 2022-2028, released in February 2022, units 1 and 5 were expected to be retired by 2028.[17] The retirement year of 2028 was listed again in the Ministry of Energy 2023-2028 energy program, released in February 2023, and the 2024-2029 energy program released in November 2023.[18][19]

Unit CC1

The new combined cycle unit, 105 MW, was listed in the Ministry of Energy 2022-2028 energy program, released in February 2022.[17] As of March 2022, the company was still intending to go forward with this proposal.[20] The project was mentioned again in the Ministry of Energy 2023-2028 and 2024-2029 energy programs, and is expected to be completed in 2028.[18][19] The turbine for the project (GTE-65) was to by supplied by Russia's Power Machines. However, in January 2024 it was reported that T Plus was considering to give up the project, partly because it could not obtain the final price of the turbine.[21]

Articles and Resources

References

  1. https://web.archive.org/web/20210615133708/https://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32738-permskaya-tec-14-gas-power-plant. Archived from the original on 15 June 2021. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 30 November 2022. {{cite web}}: Missing or empty |title= (help)
  3. 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 https://web.archive.org/web/20220102151921/https://www.tplusgroup.ru/org/perm/organization/permskaja-chp14/. Archived from the original on 02 January 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  4. 4.0 4.1 4.2 4.3 4.4 https://energybase.ru/power-plant/Perm_CHP-14. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 (PDF) https://web.archive.org/web/20230313035722/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/38_Permskii_krai_fin.pdf. Archived from the original (PDF) on 13 March 2023. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 6.2 6.3 https://web.archive.org/web/20220102151921/https://www.tplusgroup.ru/org/perm/organization/permskaja-chp14/. Archived from the original on 02 January 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  7. 7.0 7.1 7.2 7.3 (PDF) https://web.archive.org/web/20240120035218/https://www.bigpowernews.ru/photos/0/0_hwMWLFCE8gF4WY3kGoos5DkyfTCuFMXM.pdf. Archived from the original (PDF) on 20 January 2024. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 8.2 8.3 8.4 8.5 8.6 https://web.archive.org/web/20210830223039/https://www.rosteplo.ru/w/%D0%9F%D0%B5%D1%80%D0%BC%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6-14. Archived from the original on 30 August 2021. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 9.2 https://web.archive.org/web/20210801171939/https://www.kommersant.ru/doc/4926186. Archived from the original on 01 August 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  10. https://web.archive.org/web/20220810204223/https://www.kommersant.ru/doc/4817773. Archived from the original on 10 August 2022. {{cite web}}: Missing or empty |title= (help)
  11. https://web.archive.org/web/20230803101842/https://www.business-vector.info/t-pljus-minus-vagner-161332/. Archived from the original on 03 August 2023. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  12. https://www.so-ups.ru/news/press-release/press-release-view/news/21226/. {{cite web}}: Missing or empty |title= (help)
  13. https://www.eprussia.ru/news/base/2023/2318386.htm. {{cite web}}: Missing or empty |title= (help)
  14. 14.0 14.1 https://web.archive.org/web/20220708170828/https://59.ru/text/gorod/2022/03/14/70506986/. Archived from the original on 08 July 2022. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  15. https://web.archive.org/web/20230323061102/https://tass.ru/v-strane/17343395. Archived from the original on 23 March 2023. {{cite web}}: Missing or empty |title= (help)
  16. (PDF) https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/39_Permskii_krai.pdf. {{cite web}}: Missing or empty |title= (help)
  17. 17.0 17.1 "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"". Garant.ru. Feb 28, 2022. Retrieved Oct 31, 2022.{{cite web}}: CS1 maint: url-status (link)
  18. 18.0 18.1 "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ ПЕРМСКИЙ КРАЙ" (PDF). SO UPS of Russia. February 28, 2023. Retrieved November 30, 2023.{{cite web}}: CS1 maint: url-status (link)
  19. 19.0 19.1 "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ. ЭНЕРГОСИСТЕМА ПЕРМСКОГО КРАЯ" (PDF). SO UPS of Russia. November 30, 2023. Retrieved May 6, 2024.{{cite web}}: CS1 maint: url-status (link)
  20. "В 2022 году «Т Плюс» повысит надежность работы ТЭЦ в Пермском крае". 59.ru. Mar 14, 2022. Retrieved Apr 21, 2022.
  21. "Ъ: «Т Плюс» хочет отказаться от проектов модернизации ТЭЦ с турбинами «Силмаша»". peretok.ru. January 22, 2024. Retrieved May 6, 2024.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.