Perm CHP-14 power station

From Global Energy Monitor
Part of the
Global Oil and Gas Plant Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error
Related categories:

Perm CHP-14 power station (Пермская ТЭЦ-14) is an operating power station of at least 330-megawatts (MW) in Perm, Russia with multiple units, some of which are not currently operating.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Perm CHP-14 power station Perm, Perm, Russia 58.018928, 55.881863 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • 1, 2, 3, 4, 5, 6 GT, 6 ST: 58.018928, 55.881863

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year Equipment Emergency/Backup
1 Operating[2][3][4] fossil gas: natural gas, fossil liquids: heavy fuel oil[4][5] 60[3][6] steam turbine[4][7] yes[3] 1966[3] 2028 (planned)[2][4][8] – no
2 Operating[3] fossil gas: natural gas, fossil liquids: heavy fuel oil[5] 35[3][9][6] steam turbine[7] yes[3] 1967[3] – – no
3 Operating[3] fossil gas: natural gas, fossil liquids: heavy fuel oil[5] 50[3][9][6] steam turbine[7] yes[3] 1967[9] – – no
4 Operating[3] fossil gas: natural gas, fossil liquids: heavy fuel oil[5] 135[3][6] steam turbine[7] yes[3] 2008[3] – – no
5 Operating[2][9] fossil gas: natural gas, fossil liquids: heavy fuel oil[2][4] 50[9][6] steam turbine[9][4] yes[3] 1979[9] 2028 (planned)[2][4][8] – no
6 GT Pre-construction[10][11][12][13][8][14][15][2][16][17][18] fossil gas: natural gas[4][5] 65[6][11][19][12][20][21] gas turbine[12][19][20] yes[3] 2029 (planned)[6][11][12][22][8][2][17][20][23][24][25][4] – Power Machines: GTE 65.1[20] no
6 ST Pre-construction[10][11][12][13][8][14][15][2][16][17][18] fossil gas: natural gas[4][5] 40[6][11][19][12][20][21] steam turbine[12][19][20] yes[3] 2031 (planned)[6][11][12][22][8][2][17][20][23][24][26][4] – –[12][17] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
1 T Plus PJSC [100%][3] T Plus PJSC [100.0%]
2 T Plus PJSC [100%][3] T Plus PJSC [100.0%]
3 T Plus PJSC [100%][3] T Plus PJSC [100.0%]
4 T Plus PJSC [100%][3] T Plus PJSC [100.0%]
5 T Plus PJSC [100%][3] T Plus PJSC [100.0%]
6 GT T Plus PJSC [100%][3] T Plus PJSC [100.0%]
6 ST T Plus PJSC [100%][3] T Plus PJSC [100.0%]

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Planned retirements

According to the Ministry of Energy (Minenergo) energy program for 2025-2030, released in November 2024, units 1 and 5 are expected to be retired in 2028.[27]

Unit CC1

The new combined cycle unit, 105 MW, was listed in the Ministry of Energy 2022-2028 energy program, released in February 2022.[28] As of March 2022, the company was still intending to go forward with this proposal.[29] The project was mentioned again in the Ministry of Energy 2023-2028 and 2024-2029 energy programs, and is expected to be completed in 2028.[30][31] The turbine for the project (GTE-65) was to by supplied by Russia's Power Machines. However, in January 2024 it was reported that T Plus was considering to give up the project, partly because it could not obtain the final price of the turbine.[32]

In September 2024, it was reported that the GTE-65 turbine was still in the production stage, with the prototype expected to be completed in the first half of 2025. Testing is planned for Q3 2026. Originally, it was anticipated that Power Machines would complete this unit by the end of 2024, but the timeline has been adjusted to accommodate production and development requirements.[33] The project is still listed in the Scheme and Program for the Development of Electric Power System of Russia for 2025–2030, published by the Ministry of Energy in November 2024, with the commissioning deadline in 2028. As of December 2024, there have not been any further updates.[34]

The project was not included into the "General Layout of Power Infrastructure Placement until 2042", released by the Ministry of Energy of Russian in December 2024.[35]

In October 2025, it was reported that Power Machines was carrying out a production cycle of the GTE-65.1 gas turbine, including full-scale testing at the operational site. The pilot GTE-65.1 unit will be installed at the Perm CHP-14 power station as part of the plant’s modernization.[36] The commissioning of Unit CC1 has been postponed to 2031. In September 2025, design work was in progress. The prototype of the GTE-65.1 turbine is planned to be manufactured in 2026, with installation beginning in 2027 and testing starting in early 2028, expected to be completed by mid-2029.[37]

The project was included into Directive No. 4131-r of the Government of the Russian Federation, released in December 2025, as a 105-MW combined-cycle unit scheduled for commissioning by January 2031. The project will be implemented in two stages: the gas turbines will be installed first with the testing program, including verification of the equipment’s guaranteed performance parameters, scheduled for completion in 2029. This will be followed by installation of the steam turbine and transition to the combined-cycle operation.[38]

Articles and Resources

References

  1. ↑ https://web.archive.org/web/20210615133708/https://www.industryabout.com/country-territories-3/2137-russia/fossil-fuels-energy/32738-permskaya-tec-14-gas-power-plant. Archived from the original on 2021-06-15. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://web.archive.org/web/20221130155326/https://www.garant.ru/products/ipo/prime/doc/404487690/. Archived from the original on 2022-11-30. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 3.12 3.13 3.14 3.15 3.16 3.17 3.18 3.19 3.20 3.21 3.22 3.23 3.24 https://web.archive.org/web/20220102151921/https://www.tplusgroup.ru/org/perm/organization/permskaja-chp14/. Archived from the original on 2022-01-02. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 (PDF) https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2025-30_final/sipr_ups_2025-30_fin.pdf. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 5.4 5.5 https://energybase.ru/power-plant/Perm_CHP-14. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.0 6.1 6.2 6.3 6.4 6.5 6.6 6.7 6.8 (PDF) https://web.archive.org/web/20230313035722/https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2023/final/38_Permskii_krai_fin.pdf. Archived from the original (PDF) on 2023-03-13. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 7.2 7.3 https://web.archive.org/web/20220102151921/https://www.tplusgroup.ru/org/perm/organization/permskaja-chp14/. Archived from the original on 2022-01-02. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 8.2 8.3 8.4 8.5 (PDF) https://web.archive.org/web/20240120035218/https://www.bigpowernews.ru/photos/0/0_hwMWLFCE8gF4WY3kGoos5DkyfTCuFMXM.pdf. Archived from the original (PDF) on 2024-01-20. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 https://web.archive.org/web/20210830223039/https://www.rosteplo.ru/w/%D0%9F%D0%B5%D1%80%D0%BC%D1%81%D0%BA%D0%B0%D1%8F_%D0%A2%D0%AD%D0%A6-14. Archived from the original on 2021-08-30. {{cite web}}: Missing or empty |title= (help)
  10. ↑ 10.0 10.1 https://www.rbc.ru/business/30/09/2024/66f4537d9a794703af3ba72f. {{cite web}}: Missing or empty |title= (help)
  11. ↑ 11.0 11.1 11.2 11.3 11.4 11.5 https://web.archive.org/web/20210801171939/https://www.kommersant.ru/doc/4926186. Archived from the original on 2021-08-01. {{cite web}}: Missing or empty |title= (help)
  12. ↑ 12.0 12.1 12.2 12.3 12.4 12.5 12.6 12.7 12.8 https://mashnews.ru/t-plyus-sozdaet-pervuyu-v-rossijskom-tek-sistemu-kogeneraczii-na-baze-otechestvennoj-gazovoj-turbinyi-f-klassa.html. {{cite web}}: Missing or empty |title= (help)
  13. ↑ 13.0 13.1 https://web.archive.org/web/20220810204223/https://www.kommersant.ru/doc/4817773. Archived from the original on 2022-08-10. {{cite web}}: Missing or empty |title= (help)
  14. ↑ 14.0 14.1 https://web.archive.org/web/20230803101842/https://www.business-vector.info/t-pljus-minus-vagner-161332/. Archived from the original on 2023-08-03. {{cite web}}: Missing or empty |title= (help)
  15. ↑ 15.0 15.1 https://www.so-ups.ru/news/press-release/press-release-view/news/21226/. {{cite web}}: Missing or empty |title= (help)
  16. ↑ 16.0 16.1 https://www.eprussia.ru/news/base/2023/2318386.htm. {{cite web}}: Missing or empty |title= (help)
  17. ↑ 17.0 17.1 17.2 17.3 17.4 https://myseldon.com/ru/news/index/340050715. {{cite web}}: Missing or empty |title= (help)
  18. ↑ 18.0 18.1 https://neftegaz.ru/news/energy/882047-doekhali-pervaya-gazovaya-turbina-bolshoy-moshchnosti-gte-170-1-dostavlena-na-kashirskuyu-gres/. {{cite web}}: Missing or empty |title= (help)
  19. ↑ 19.0 19.1 19.2 19.3 https://web.archive.org/web/20220708170828/https://59.ru/text/gorod/2022/03/14/70506986/. Archived from the original on 2022-07-08. {{cite web}}: Missing or empty |title= (help)
  20. ↑ 20.0 20.1 20.2 20.3 20.4 20.5 20.6 https://power-m.ru/press-center/news/silovye-mashiny-i-t-plyus-realizuyut-proekt-kogeneratsii-s-primeneniem-gazovoy-turbiny-gte-65-1-dlya/. {{cite web}}: Missing or empty |title= (help)
  21. ↑ 21.0 21.1 https://www.eprussia.ru/news/base/2025/9121041.htm. {{cite web}}: Missing or empty |title= (help)
  22. ↑ 22.0 22.1 https://tass.ru/interviews/24941323. {{cite web}}: Missing or empty |title= (help)
  23. ↑ 23.0 23.1 https://web.archive.org/web/20230323061102/https://tass.ru/v-strane/17343395. Archived from the original on 2023-03-23. {{cite web}}: Missing or empty |title= (help)
  24. ↑ 24.0 24.1 (PDF) https://www.so-ups.ru/fileadmin/files/company/future_plan/public_discussion/2024/final/39_Permskii_krai.pdf. {{cite web}}: Missing or empty |title= (help)
  25. ↑ https://peretok.ru/news/engineering/29497/. {{cite web}}: Missing or empty |title= (help)
  26. ↑ http://publication.pravo.gov.ru/document/0001202512290115?index=10. {{cite web}}: Missing or empty |title= (help)
  27. ↑ "Обосновывающие материалы к СиПР ЭЭС России на 2025-2030 годы". SO UPS of Russia. November 29, 2024. Retrieved December 5, 2024.{{cite web}}: CS1 maint: url-status (link)
  28. ↑ "Приказ Министерства энергетики РФ от 28 февраля 2022 г. № 146 "Об утверждении схемы и программы развития Единой энергетической системы России на 2022 - 2028 годы"". Garant.ru. Feb 28, 2022. Retrieved Oct 31, 2022.{{cite web}}: CS1 maint: url-status (link)
  29. ↑ "В 2022 году «Т Плюс» повысит надежность работы ТЭЦ в Пермском крае". 59.ru. Mar 14, 2022. Retrieved Apr 21, 2022.
  30. ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2023–2028 ГОДЫ ПЕРМСКИЙ КРАЙ" (PDF). SO UPS of Russia. February 28, 2023. Retrieved November 30, 2023.{{cite web}}: CS1 maint: url-status (link)
  31. ↑ "СХЕМА И ПРОГРАММА РАЗВИТИЯ ЭЛЕКТРОЭНЕРГЕТИЧЕСКИХ СИСТЕМ РОССИИ НА 2024–2029 ГОДЫ. ЭНЕРГОСИСТЕМА ПЕРМСКОГО КРАЯ" (PDF). SO UPS of Russia. November 30, 2023. Retrieved May 6, 2024.{{cite web}}: CS1 maint: url-status (link)
  32. ↑ "Ъ: «Т Плюс» хочет отказаться от проектов модернизации ТЭЦ с турбинами «Силмаша»". peretok.ru. January 22, 2024. Retrieved May 6, 2024.{{cite web}}: CS1 maint: url-status (link)
  33. ↑ "Энергетикам отменят льготы для отечественных турбин при модернизации ТЭС". РБК. September 30, 2024. Retrieved December 5, 2024.{{cite web}}: CS1 maint: url-status (link)
  34. ↑ "Обосновывающие материалы к СиПР ЭЭС России на 2025-2030 годы". SO UPS of Russia. November 29, 2024. Retrieved December 5, 2024.{{cite web}}: CS1 maint: url-status (link)
  35. ↑ "ГЕНЕРАЛЬНАЯ СХЕМА размещения объектов электроэнергетики до 2042 года" (PDF). SDO UPS of Russia. December 30, 2024. Retrieved March 10, 2025.{{cite web}}: CS1 maint: url-status (link)
  36. ↑ "«Т Плюс» создает первую в российском ТЭК систему когенерации на базе отечественной газовой турбины F-класса". mashnews.ru. October 16, 2025. Retrieved October 16, 2025.{{cite web}}: CS1 maint: url-status (link)
  37. ↑ "Глава "Т Плюс": сроки плановых отключений горячей воды в РФ будут сокращаться". TASS. September 3, 2025. Retrieved October 17, 2025.{{cite web}}: CS1 maint: url-status (link)
  38. ↑ "Распоряжение Правительства Российской Федерации от 27.12.2025 № 4131-р". publication.pravo.gov.ru. 2025-12-27. Retrieved 2026-03-24.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.