Peusanga hydroelectric plant

From Global Energy Monitor
Part of the
Global Hydropower Tracker,
a Global Energy Monitor project.
Report an error

Other names: Peusanga 1 & 2 hydroelectric plant

Peusanga hydroelectric plant (PLTA Peusanga 1 & 2, PLTA Peusanga) is a hydroelectric power plant under construction in Isaq Village, Linge District, Central Aceh Regency, Aceh Province, Indonesia.

Project Details

Table 1: Project details for Peusanga hydroelectric plant

Status Commissioning year Nameplate capacity Turbines Technology type Owner
Construction[1][2] 2025[3] 88 MW[2] 2 x 23.1 MW; 2 x 22 MW[4] Run-of-river[2] PT PLN (Persero) [100%] (PT Perusahaan Listrik Negara)[5]

Location

Table 2: Location details for Peusanga hydroelectric plant

Location River Coordinates (WGS 84)
Isaq Village, Linge District, Central Aceh Regency, Aceh Province, Indonesia[5] Peusangan River[6] 4.4495, 96.8839 (approximate)[5]

The map below shows the approximate location of the hydroelectric power plant:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.

References

  1. https://www.petromindo.com/news/article/peusangan-hydropower-plant-to-start-commercial-operation-in-october. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 https://www.pwc.com/id/en/media-centre/infrastructure-news/may-2022/pln-targets-operation-of-peusangan-hydroelectric-power-plant. {{cite web}}: Missing or empty |title= (help)
  3. https://web.archive.org/web/20240109005434/https://en.antaranews.com/news/297549/minister-stresses-hydropower-use-to-speed-up-energy-transition. Archived from the original on 2024-01-09. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://www.andritz.com/resource/blob/31246/e29852aa1eed5d1d8fd8d7be55938fee/hy-25-peusangan-1-2-data.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 https://www.pwc.com/id/en/media-centre/infrastructure-news/may-2022/pln-targets-operation-of-peusangan-hydroelectric-power-plant-in-july-2023.html. {{cite web}}: Missing or empty |title= (help)
  6. https://web.archive.org/web/20210920025020/https://www.andritz.com/hydro-en/hydronews/25/hy-25-10-peusangan. Archived from the original on 2021-09-20. {{cite web}}: Missing or empty |title= (help)