Pilbara Generation Project solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Pilbara Generation Project solar farm is a solar photovoltaic (PV) farm under construction in Western Australia, Australia.

Project Details

Table 1: Phase-level project details for Pilbara Generation Project solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
Lambda Junction Shelved (inferred August 2023) 75 MW[1] PV[1] Fortescue Metals Group[2] Pilbara Energy PTY LTD[2]
North Star Junction Construction[3] 2024 (planned)[3] 150 MW[4] PV[1] Fortescue Metals Group[2] Pilbara Energy PTY LTD[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Pilbara Generation Project solar farm

Phase Name Location Coordinates (WGS 84)
Lambda Junction Western Australia, Australia[2] -24.2071, 118.0649 (approximate)[2]
North Star Junction Western Australia, Australia[2] -24.2071, 118.0649 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 (PDF) https://www.epa.wa.gov.au/sites/default/files/Referral_Documentation/Supporting%20Document_13.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 https://icn.org.au/project/pilbara-generation-project/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://www.genus.com.au/projects/pilbara-generation-project. {{cite web}}: Missing or empty |title= (help)
  4. (PDF) https://www.epa.wa.gov.au/sites/default/files/1MINSTAT/1686%20Statement%20for%20publishing%20-%20PEG%20Power%20Station.pdf. {{cite web}}: Missing or empty |title= (help)