Pinal Central Energy Center Hybrid solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Pinal Central Energy Center Hybrid solar farm is an operating solar photovoltaic (PV) farm in Pinal County, Arizona, United States.

Project Details

Table 1: Phase-level project details for Pinal Central Energy Center Hybrid solar farm

Status Commissioning year Nameplate capacity Technology Owner Operator
Operating[1] 2018[1] 20 MWac[1] PV[1] NextEra Energy Inc [100%][2] NextEra Energy[3]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Pinal Central Energy Center Hybrid solar farm

Location Coordinates (WGS 84)
Pinal County, Arizona, United States[1] 32.8757, -111.5511 (exact)[1]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. ↑ https://web.archive.org/web/20240206202736/https://www.pinalcentral.com/business_and_technology/large-solar-projects-making-their-way-to-coolidge/article_ab58552d-b3d2-59c2-a770-277be8a029d6.html. Archived from the original on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  3. ↑ https://web.archive.org/web/20240201194006/https://pv-magazine-usa.com/2021/08/11/nextera-will-build-a-solar-storage-project-with-salt-river-project-as-offtaker/. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)