Pingguo Aluminum power station (中铝广西分公司自备电厂(平果铝自备电厂)) is an operating power station of at least 90-megawatts (MW) in Matou Town, Pingguo, Baise, Guangxi, China.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Pingguo Aluminum power station Matou Town, Pingguo, Baise, Guangxi, China 23.339659, 107.510738 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Unit 2, Unit 5, Unit 6: 23.339659, 107.510738

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Unit 2 Operating coal: unknown[1] 30 subcritical 1998 False
Unit 5 Operating coal: unknown[1] 30 subcritical 2008 False
Unit 6 Operating coal: unknown[1] 30 subcritical 2008 False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Unit 2 Pingguo Aluminium Co [100%] Aluminum Corporation of China Ltd [100.0%]
Unit 5 Pingguo Aluminium Co [100%] Aluminum Corporation of China Ltd [100.0%]
Unit 6 Pingguo Aluminium Co [100%] Aluminum Corporation of China Ltd [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power
  • Captive industry: Aluminum


Project-level coal details

  • Coal source(s): domestic

Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Background

Pingguo Aluminum Smelter power station is a six-unit coal-fired power plant with a total capacity of 122 MW. The first 3 units were completed in 1996, 1998, and 2003. [2] The next 3 units (units 4-6) were commissioned in 2008. [3] It is owned by CHALCO.[4]

Expansion Project

CHALCO has proposed an expansion of 1,050 MW at this plant.[5] [6] [7]

In 2015, CHALCO, Guangxi Investment Co and Guangxi Baise Development Investment Group co-invested in "Guangxi Hualei New Material Company Ltd", which is developing 400 thousand-ton aluminum water project with 3*350MW coal fired power units, known as Guangxi Hualei power station. [8] [9]

The aluminum water project was approved by the China NDRC in 2015. [10]

The power plant was commissioned in September 2017, along with the aluminum water project.[11]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. ↑ "中国铝业股份有限公司广西分公司热电厂"电力行业节能环保公众服务平台(Power Saving and Environmental Protection Public Service Platform), 1996/5/1
  3. ↑ "中国铝业股份有限公司广西分公司40万吨铝水及配套自备发电机组工程环境影响评价报告书"中铝国际工程有限公司,2016-11-1
  4. ↑ Pingguo Smelter Powerplant, Enipedia, accessed Sept. 2015.
  5. ↑ "百色解决"电价之痛" 平果打造“千亿铝产业”," 广西新闻网, 2014-08-16
  6. ↑ "中国铝业股份有限公司广西分公司 40 万吨铝水及配套自备发电机组工程项目环境影响评价公众参与第二次信息公示" 中国电力化工网, 2016-01-15
  7. ↑ "中国铝业关于拟建设广西轻合金材料项目及向广西华磊新材料有限公司增资的公告"网易财经 2016--5-9
  8. ↑ "广西华磊新材料有限公司在平果县揭牌" 广西新闻网 2016年03月01日
  9. ↑ "中国铝业股份有限公司广西分公司40万吨铝水及配套自备发电机组工程环境影响评价报告书"中铝国际工程有限公司,2016-11-1
  10. ↑ "生态铝重点项目概况" 百色市工业和信息化委员会, 2015-12-01
  11. ↑ "广西华磊新材料有限公司轻合金材料项目投产"Guangxi News, 2017-09-25

Additional data

To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.