Pinghu LNG Terminal

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Pinghu LNG Terminal, also known as Jiaxing LNG Terminal, 嘉兴平湖独山港LNG应急调峰储运站, and 浙江嘉兴LNG应急调峰储运站, is an operating LNG import terminal in China.

Location

Table 1: Location details

Name Location Coordinates (WGS 84)
Pinghu LNG Terminal Dushan Port, Jiaxing, Zhejiang, China[1] 30.681206, 121.246827 (exact)

The map below shows the exact location of the terminal:

Loading map...

Project Details

Table 2: Infrastructure details

mtpa = million tonnes per year
Name Facility type Status Capacity Total terminal capacity Offshore Associated infrastructure
Pinghu LNG Terminal import[2] operating[3] 1 mtpa[2] 1.0 mtpa False http://www.hqhunt.com/newsdetail?article_id=5383

Table 3: Cost

Name Facility type Cost Total known terminal costs
Pinghu LNG Terminal import[2] US$384,000,000 (2,400,000,000 RMB)[3] US$384,000,000

Financing

No financing data available.

Table 4: Project timeline

FID = Final Investment Decision, used by some developers to indicate a project will move forward
Name Facility type Status Proposal year FID year Construction year Operating year Inactive year
Pinghu LNG Terminal import[2] operating[3] 2017[4] – 2020[5] 2022[3] –

Ownership

Table 5: Ownership

Name Facility type Status Owners Parent companies Operator
Pinghu LNG Terminal import[2] operating[3] Zhejiang Hangjiaxin Clean Energy Co Ltd [100%][6] Zhejiang Hangjiaxin Clean Energy Co Ltd [100.0%] –

Background

Pinghu LNG Terminal, also known as Jiaxing LNG Terminal (嘉兴平湖独山港LNG应急调峰储运站), is an operating LNG import terminal in Dushan Harbor, Pinghu, jiaxing, Zhejian Province, China.

Jiaxing Gas and Hangzhou Gas are building a 1-mtpa terminal in the Dushan Harbor area of Pinghu, Jiaxing, Zhejiang Province, China.[7]

The construction ceremony was held on June 30, 2020.[8]

In January 2021, the supporting gas pipeline connecting the LNG terminal and the city pipeline network began.[9]

In January 2022, Pinghu LNG Terminal began operations.[10]

In July 2022, the first LNG ship from Malaysia began to offload LNG at the terminal, signalling its official operation.[11][12]

  • Owner: Zhejiang Hangjiaxin Clean Energy Co., Ltd. 浙江杭嘉鑫清洁能源有限公司[13]
  • Parent company: Jiaxing Gas Group Co., Ltd. 51.00%, Hangzhou Gas Group Co., Ltd. 49.00%
嘉兴市燃气集团股份有限公司 51.00% -
杭州市燃气集团有限公司 49.00%

Articles and Resources

Additional data

To access additional data, including an interactive map of LNG terminals, a downloadable dataset, and summary data, please visit the Global Gas Infrastructure Tracker on the Global Energy Monitor website.

References

  1. ↑ https://finance.sina.cn/2022-09-23/detail-imqqsmrp0269611.d.html?from=wap. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 https://finance.sina.cn/2022-07-18/detail-imizmscv2312428.d.html. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 3.2 3.3 3.4 https://www.sohu.com/a/573800961_121123883. {{cite web}}: Missing or empty |title= (help)
  4. ↑ http://www.jxrqgs.com/NewsDetail.aspx?ID=1564. {{cite web}}: Missing or empty |title= (help)
  5. ↑ https://www.thepaper.cn/newsDetail_forward_8087441. {{cite web}}: Missing or empty |title= (help)
  6. ↑ https://www.qcc.com/firm/6e5acde4a6f56471ea8d89bbb6cd1719.html. {{cite web}}: Missing or empty |title= (help)
  7. ↑ LNG Peak Shaving Terminal, Zhejiang, Halcrow Sea, accessed August 2019
  8. ↑ 浙江嘉兴(平湖)LNG应急调峰储运站项目码头工程开工 Source: Jiaxing Government website, 07-01-2020
  9. ↑ 浙江嘉兴LNG接收站应急调峰储运站项目气化外输保供管线工程开工顺利举行 Source: 国际船舶海工网, 1-25-2021
  10. ↑ World LNG Report 2022, p.81. IGU. July 2022.
  11. ↑ "浙江嘉兴LNG应急调峰储运站正式投运-新华财经官方微博--手机新浪". finance.sina.cn. 2022-07-18.{{cite web}}: CS1 maint: url-status (link)
  12. ↑ sina_mobile (2022-09-23). "嘉兴天然气保供有了"第二气源"!嘉兴(平湖)LNG应急调峰储运站竣工投产". finance.sina.cn.{{cite web}}: CS1 maint: url-status (link)
  13. ↑ "浙江杭嘉鑫清洁能源有限公司 - 企查查". www.qcc.com. Retrieved 2021-04-20.{{cite web}}: CS1 maint: url-status (link)