Pingwei power station (中电国际平圩发电厂) is an operating power station of at least 6540-megawatts (MW) in pingxv Town, Panji, Huainan, Anhui, China. It is also known as 淮南平圩电厂.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Pingwei power station pingxv Town, Panji, Huainan, Anhui, China 32.68417, 116.901389 (exact)
Loading map...

Unit-level coordinates (WGS 84):

  • Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4, Phase III Unit 5, Phase III Unit 6, Phase IV Unit 7, Phase IV Unit 8: 32.68417, 116.901389

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
Phase I Unit 1 Operating coal: bituminous[1] 630 subcritical 1989 False
Phase I Unit 2 Operating coal: bituminous[1] 630 subcritical 1992 False
Phase II Unit 3 Operating coal: bituminous[1] 640 supercritical 2007 False
Phase II Unit 4 Operating coal: bituminous[1] 640 supercritical 2007 False
Phase III Unit 5 Operating coal: bituminous[1] 1000 ultra-supercritical 2015 False
Phase III Unit 6 Operating coal: bituminous[1] 1000 ultra-supercritical 2015 False
Phase IV Unit 7 Operating[2][3] coal: bituminous[2][1] 1000[2] ultra-supercritical[2] 2026[3] False
Phase IV Unit 8 Operating[2][4] coal: bituminous[2][1] 1000[2] ultra-supercritical[2] 2026[4] False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Phase I Unit 1 Anhui Huainan Pingwei Power Generation Co Ltd [100%] China Power International Development Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [33.2%]; unknown [3.5%]; China Cinda Asset Management Co Ltd [3.3%]
Phase I Unit 2 Anhui Huainan Pingwei Power Generation Co Ltd [100%] China Power International Development Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [33.2%]; unknown [3.5%]; China Cinda Asset Management Co Ltd [3.3%]
Phase II Unit 3 Huainan Pingwei No.2 Electrical Power Co Ltd [100%] China Power International Development Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [33.2%]; unknown [3.5%]; China Cinda Asset Management Co Ltd [3.3%]
Phase II Unit 4 Huainan Pingwei No.2 Electrical Power Co Ltd [100%] China Power International Development Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [33.2%]; unknown [3.5%]; China Cinda Asset Management Co Ltd [3.3%]
Phase III Unit 5 Huainan Pingwei No.3 Power Generation Co Ltd [100%] China Power International Development Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [33.2%]; unknown [3.5%]; China Cinda Asset Management Co Ltd [3.3%]
Phase III Unit 6 Huainan Pingwei No.3 Power Generation Co Ltd [100%] China Power International Development Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [33.2%]; unknown [3.5%]; China Cinda Asset Management Co Ltd [3.3%]
Phase IV Unit 7 Anhui Huainan Pingwei Power Generation Co Ltd [100%][5] China Power International Development Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [33.2%]; unknown [3.5%]; China Cinda Asset Management Co Ltd [3.3%]
Phase IV Unit 8 Anhui Huainan Pingwei Power Generation Co Ltd [100%][6] China Power International Development Co Ltd [60.0%]; Huaihe Energy Holding Group Co Ltd [33.2%]; unknown [3.5%]; China Cinda Asset Management Co Ltd [3.3%]

Project-level coal details

  • Coal source(s): domestic
  • Permit(s): 皖发改能源〔2022〕632号[5]

Background

Pingwei-I and Pingwei-II

The first four coal-fired units of Pingwei power station, totaling 2,540 MW, were brought online between 1989 and 2007.[7] The plant was originally owned by CPI.[8][9][10]

Pingwei-III

CPI planned Pingwei-III, consisting of two additional coal-fired units, with a total planned capacity of 2,000 MW. The project was approved by the National Development and Reform Commission in February 2013, and construction began shortly thereafter. The new units are scheduled to be completed in 2015.[11]

Unit 1 of the expansion began operation in June 2015,[12] and unit 2 in September 2015.[13]

Pingwei-IV

In March 2020, two additional 1,000 MW units at the power station (Pingwei-IV) were listed as a priority project for Anhui province, as part of a UHV power hub in the Yangtze River Delta.[14]

The expansion was permitted by November 17, 2022.[15][16]

Construction of Unit 7 started in late 2023, with the first concrete pour for the main building.[17] Throughout 2024 and 2025, the project hit numerous milestones including the start of boiler installation, cooling tower construction, and boiler water pressure tests.[18][19]

The unit was connected to the grid in December 2025 and passed its 168-hour trial run in February 2026.[20][21]

Construction of Unit 8 began in early 2024 with the first boiler steel hoisting.[22][23]

Major equipment installations and system tests occurred in 2025 and 2026.[24]

The unit was connected to the grid in May 2026 and passed its 168-hour trial run at the end of May 2026.[25][26]

Ownership

In July 2015, China Power Investment Corporation (CPI) and State Nuclear Power Technology Corporation (SNPTC) merged to become State Power Investment Corporation (国家电力投资集团), one of the five largest state-owned electricity producers in the People's Republic of China.[27]

Articles and Resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 "安徽淮南平圩电厂四期2×1000兆瓦超超临界燃煤发电工程项目开工!". Weixin Official Accounts Platform. 2023-12-31. Archived from the original on 2024-02-07. Retrieved 2024-01-03.
  3. 3.0 3.1 https://mp.weixin.qq.com/s/gqSB4SujaQ45y4qDvIJOyA. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 http://www.ah.xinhuanet.com/20260601/78bef28f15fc4f1f9e7a00f2f82a20af/c.html. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 https://jx.ah.gov.cn/site/tpl/1034671121?id=23461. {{cite web}}: Missing or empty |title= (help)
  6. https://news.bjx.com.cn/html/20230411/1300379.shtml. {{cite web}}: Missing or empty |title= (help)
  7. "平圩发电厂-百度百科". Baidu Baike.com.{{cite web}}: CS1 maint: url-status (link)
  8. The 2nd Generating Unit of Pingwei Power Plant II of China Power Commenced Commercial Opertation, CPI press release, 2007-11-26.
  9. Pingwei Powerplant, Enipedia, accessed 2014-11.
  10. Anhui Pingwei Coal Power Plant China, Global Energy Observatory, accessed 2014-11.
  11. Pingwei Power Plant III Enters into Three Service Agreements to Manage the Project and Construct Two New 1,000 MW Ultra Super-Critical Coal-Fired Power Generating Units, Bloomberg Businessweek, 2013-06-28.
  12. "中国能建承建平圩电厂三期工程5号机组投产," China Enterprise Reform and Development Society, 2015-06-01
  13. "中电工程设计的世界首座“三百工程”电厂机组全部投产," 2015-09-25
  14. "全文|安徽省实施长江三角洲区域一体化发展规划纲要行动计划," 安徽省人民政府, 2020/3/13
  15. 2×1000MW!淮南平圩电厂四期项目核准前公示, BJX, 2022-10-24
  16. 皖发改能源〔2022〕632号, Anhui Province Approvals, 2022-11-17
  17. "淮南平圩电厂四期2×1000兆瓦超超临界燃煤发电工程项目浇筑主厂房第一方混凝土". WeChat. 2023-12-29. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  18. "淮南平圩电厂四期2×1000兆瓦超超临界燃煤发电工程项目7号锅炉钢架顺利开吊". BeiJiXing (BJX) News. 2024-04-09. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  19. "淮南平圩电厂四期2×100万千瓦超超临界燃煤发电机组项目冷却塔筒壁结构顺利封顶". BeiJiXing (BJX) News. 2025-05-26. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  20. "中国电力平圩四期2×1000兆瓦超超临界燃煤发电机组工程7号机组首次并网一次成功". BeiJiXing (BJX) News. 2026-01-06. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  21. "淮南平圩电厂四期2×1000兆瓦超超临界燃煤发电项目7号机组通过168小时满负荷试运行". WeChat. 2026-02-09. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  22. "淮南平圩电厂四期项目8号锅炉基础筏板开始浇筑". WeChat. 2024-01-30. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  23. "淮南平圩电厂四期2×1000兆瓦超超临界燃煤发电工程项目8号锅炉首根钢架顺利开吊". WeChat. 2024-05-26. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  24. "平圩电厂四期2×1000兆瓦超超临界燃煤发电机组项目8号机组电气倒送电一次成功". WeChat. 2025-09-30. Retrieved 2026-05-30.{{cite web}}: CS1 maint: url-status (link)
  25. "平圩电厂四期2×1000MW机组#8机组并网一次成功". WeChat. 2026-05-01. Retrieved 2026-07-22.{{cite web}}: CS1 maint: url-status (link)
  26. "淮南平圩电厂四期2×1000兆瓦超超临界燃煤发电机组工程8号机组圆满完成168小时满负荷试运行". WeChat. 2026-05-29. Retrieved 2026-07-22.{{cite web}}: CS1 maint: url-status (link)
  27. "Chinese nuclear giant officially launched". World Nuclear Association. 16 July 2015. Retrieved 4 May 2015.

Additional data