Plan Futuro Andorra wind farm is a wind farm in pre-construction in Spain.

Project Details

Table 1: Phase-level project details for Plan Futuro Andorra wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
Alcor Pre-construction[1] 2027 (planned)[2] 111.6 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Castillo Pre-construction[1] 2027 (planned)[2] 111.6 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Empeltre Pre-construction[1] 2027 (planned)[2] 173.6 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Itaca Pre-construction[1] 2027 (planned)[2] 55.8 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
La Plana Pre-construction[1] 2027 (planned)[2] 86.8 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Pitarra Pre-construction[1] 2027 (planned)[2] 108 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Torica Pre-construction[1] 2027 (planned)[2] 48 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]

Location

Table 2: Phase-level location details for Plan Futuro Andorra wind farm

Phase Name Location Coordinates (WGS 84)
Alcor Spain[1] 41.0827, -0.1606 (approximate)[1]
Castillo Spain[1] 41.0827, -0.1606 (approximate)[1]
Empeltre Spain[1] 41.0827, -0.1606 (approximate)[1]
Itaca Spain[1] 41.0827, -0.1606 (approximate)[1]
La Plana Spain[1] 41.0827, -0.1606 (approximate)[1]
Pitarra Spain[1] 41.0827, -0.1606 (approximate)[1]
Torica Spain[1] 41.0827, -0.1606 (approximate)[1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 "Endesa presenta su plan de futuro para Andorra que dejará dentro de 5 años 500 empleos fijos y duraderos en la zona". Endesa. 2022-12-15. Archived from the original on 2024-01-26.
  2. 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://elperiodicodelaenergia.com/endesa-pone-el-foco-en-la-rentabilidad-y-en-la-electrificacion-limpia-en-los-proximos-tres-anos/. {{cite web}}: Missing or empty |title= (help)