Plan Futuro Andorra wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Futur-e Plan, Teruel wind farm

Plan Futuro Andorra wind farm is a wind farm in pre-construction in Spain.

Project Details

Table 1: Phase-level project details for Plan Futuro Andorra wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
Alcor Pre-construction[1] 2027 (planned)[2] 111.6 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Castillo Pre-construction[1] 2027 (planned)[2] 111.6 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Empeltre Pre-construction[1] 2027 (planned)[2] 173.6 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Itaca Pre-construction[1] 2027 (planned)[2] 55.8 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
La Plana Pre-construction[1] 2027 (planned)[2] 86.8 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Pitarra Pre-construction[1] 2027 (planned)[2] 108 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]
Torica Pre-construction[1] 2027 (planned)[2] 48 MW[1] Onshore[1] Endesa SA [100%][1] Endesa[1]

Location

Table 2: Phase-level location details for Plan Futuro Andorra wind farm

Phase Name Location Coordinates (WGS 84)
Alcor Spain[1] 41.0827, -0.1606 (approximate)[1]
Castillo Spain[1] 41.0827, -0.1606 (approximate)[1]
Empeltre Spain[1] 41.0827, -0.1606 (approximate)[1]
Itaca Spain[1] 41.0827, -0.1606 (approximate)[1]
La Plana Spain[1] 41.0827, -0.1606 (approximate)[1]
Pitarra Spain[1] 41.0827, -0.1606 (approximate)[1]
Torica Spain[1] 41.0827, -0.1606 (approximate)[1]

The map below shows the approximate locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 1.27 1.28 1.29 1.30 1.31 1.32 1.33 1.34 1.35 1.36 1.37 1.38 1.39 1.40 1.41 1.42 1.43 1.44 1.45 1.46 1.47 1.48 "Endesa presenta su plan de futuro para Andorra que dejará dentro de 5 años 500 empleos fijos y duraderos en la zona". Endesa. 2022-12-15. Archived from the original on 2024-01-26.
  2. ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://elperiodicodelaenergia.com/endesa-pone-el-foco-en-la-rentabilidad-y-en-la-electrificacion-limpia-en-los-proximos-tres-anos/. {{cite web}}: Missing or empty |title= (help)