TT Iron and Steel Point Lisas steel plant
| This article is part of the Global Iron and Steel Tracker, a project of Global Energy Monitor. |
| Sub-articles: |
TT Iron and Steel Point Lisas steel plant (Planta siderúrgica Point Lisas), also known as ISCOTT steel plant, Iron and Steel Company of Trinidad and Tobago, Arcelormittal Point Lisas, is a steel plant in Point Lisas, Couva-Tabaquite-Talparo, Trinidad and Tobago that operates electric arc furnace (EAF) and direct reduced iron (DRI) technology.
Location
The map below shows the exact location of the plant in Point Lisas, Couva-Tabaquite-Talparo, Trinidad and Tobago:
- Location: Point Lisas Industrial Estate, Couva, Trinidad and Tobago, West Indies
- Coordinates (WGS 84): 10.403605, -61.482939 (exact)
Background
At the time of its commissioning in 1980, the Point Lisas steel plant was known as ISCOTT (the Iron and Steel Company of Trinidad and Tobago).[1] The original facility included two Midrex Direct Reduction Iron (DRI) modules with a combined capacity of 840 ttpa (thousand tonnes per annum) and a melt shop with two 90-tonne Demag electric arc furnaces (EAF).[1] A third Midrex module with a capacity of 1360 ttpa was added in 1999.[2]
In 2006, the Point LIsas plant became a wholly owned subsidiary of ArcelorMittal.[1] Over the next decade the plant faced a series of challenges, including worker unrest, competition from Turkey and China, and mounting debt due to increased costs and a slowdown in the global steel industry.[1] Production declined precipitously at the end of 2015, and in March 2016 the plant was shuttered, leading to the dismissal of 644 workers.[1][3]
Repeated attempts to sell off the plant's assets over the next six years were unsuccessful, and the plant remained mothballed as of February 2022.[3][4][5]
As of November 2022, press reports indicated that the plant was to be sold to TT Iron & Steel Company Ltd, pending government approval and the negotiation of new power purchase agreements.[6] In June 2023, TT Iron officially confirmed its impending purchase of the plant, stating that it planned to invest US $150 million to US $200 million in refurbishing the plant over the next two years.[7] Production was expected to resume under new ownership as early as December 2024, with TT Iron confirming that it eventually planned to convert the plant to run on green hydrogen.[8]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Plant Details
Table 1: General Plant Details
| Start date | Idled date | Workforce size |
|---|---|---|
| 1980[9][10] | 2016[11] | 500[12][13] |
Table 2: Ownership and Parent Company Information
| Parent company | Parent company PermID | Parent GEM entity ID | Owner | Owner company PermID | Owner GEM entity ID |
|---|---|---|---|---|---|
| TT Iron Steel Company Ltd [100.0%] | unknown [100.0%] | E100000131191 [100.0%] | TT Iron Steel Company Ltd [100%][14] | unknown | E100000131191 [100%] |
Table 3: Process and Products
| Steel product category | Steel products | Steel sector end users | Main production equipment |
|---|---|---|---|
| semi-finished, finished rolled[15] | billet, wire rod[15] | building and infrastructure[9] | DRI; EAF |
Table 4: Plant-level Crude Steel Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Electric arc furnace steelmaking capacity | Nominal crude steel capacity (total) |
|---|---|---|
| mothballed | 1000[12][9][16][17] | 1000[12][9][16][17] |
Table 5: Plant-level Crude Iron Production Capacities (thousand tonnes per annum)
| Capacity operating status1 | Sponge iron/DRI capacity | Nominal iron capacity (total) |
|---|---|---|
| mothballed | 2200[12][18][16][19] | 2200[12][18][16][19] |
Table 6: Upstream Products Production Capacities (thousand tonnes per annum)
| Sinter | Pellets |
|---|---|
| NF | NF |
Unit Details
Table 7: Direct Reduced Iron Furnace Details
| Unit name | Status | Start date | Furnace manufacturer and model | Furnace type | Current capacity (ttpa) |
|---|---|---|---|---|---|
| DRI 1 | mothballed[14][11] | 1980[20] | Midrex CDRI 400 series[20] | shaft furnace[20] | 420[16][19][18] |
| DRI 2 | mothballed[14][11] | 1980[20] | Midrex CDRI 400 Series[20][20] | shaft furnace[20] | 420[16][19][18] |
| DRI 3 | mothballed[14][11] | 1999[20] | Midrex CDRI Mega Module | shaft furnace[21] | 1360[16][12][19][18] |
Table 8: Direct Reduced Iron Furnace Reductant Details
| Unit name | Current or initial reductant | Gas reductant | Hydrogen reductant status |
|---|---|---|---|
| DRI 1 | gas[22] | syngas (reformed methane)[22] | capable[21] |
| DRI 2 | gas[22] | syngas (reformed methane)[22] | capable[22] |
| DRI 3 | gas[22] | syngas (reformed methane)[22] | capable[21] |
Table 9: Electric Arc Furnace Details
| Unit name | Status | Start date | Furnace manufacturer and model | Current capacity (ttpa) | Current size (tonnes) |
|---|---|---|---|---|---|
| unknown EAF (1) | mothballed[14][11] | 1980[23] | Demag[23] | 500[16][12][17][9] | 90.0[24][9][25][16][19] |
| unknown EAF (2) | mothballed[14][11] | 1980[23] | Demag[23] | 500[16][12][17][9] | 90.0[24][9][25][16][19] |
Table 10: Electric Arc Furnace Feedstock Details
| Unit name | Scrap-based | % scrap | % DRI |
|---|---|---|---|
| unknown EAF (1) | yes[12][26] | >0[12][26] | >0[12][26] |
| unknown EAF (2) | yes[12][26] | >0[12][26] | >0[12][26] |
Articles and Resources
Additional data
To access additional data, including an interactive map of steel plants, a downloadable dataset, and summary data, please visit the Global Iron and Steel Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 "Impact of the Closure of a Large Foreign Direct Investment: The Case of ArcelorMittal in Trinidad and Tobago" (PDF). Central Bank of Trinidad and Tobago. January 2020.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Midrex® Plants" (PDF). Midrex. May 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ 3.0 3.1 "Third attempt to sell ArcelorMittal assets". Trinidad Express. March 2, 2021.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Request for Expressions of Interest". ArcelorMittal Point Lisas Limited (In Liquidation). October 2018.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Clarity needed on steel plant". Trinidad and Tobago Newsday. September 25, 2019.
{{cite web}}: CS1 maint: url-status (link) - ↑ "Point Lisas Steel plant to be restarted, six years after closure". Trinidad & Tobago Guardian. November 9, 2022. Retrieved 2023-12-11.
{{cite web}}: CS1 maint: url-status (link) - ↑ "TT Iron Steel Company". TT Iron & Steel. Retrieved 2023-12-11.
{{cite web}}: CS1 maint: url-status (link) - ↑ "ArcelorMittal Finds Buyer for Idled Steel Mill". AIST. June 12, 2023.
{{cite web}}: CS1 maint: url-status (link) - ↑ 9.0 9.1 9.2 9.3 9.4 9.5 9.6 9.7 (PDF) https://web.archive.org/web/20220320122951/https://www.central-bank.org.tt/sites/default/files/page-file-uploads/impact-of-the-closure-of-arcelorMittal-abobb-lsonnylall-kthompson-rmahabir-jan-2020.pdf. Archived from the original (PDF) on 2022-03-20.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20220318220335/https://newsday.co.tt/2019/09/25/clarity-needed-on-steel-plant/. Archived from the original on 2022-03-18.
{{cite web}}: Missing or empty|title=(help) - ↑ 11.0 11.1 11.2 11.3 11.4 11.5 https://web.archive.org/web/20220319033325/https://trinidadexpress.com/business/local/third-attempt-to-sell-arcelormittal-assets/article_73b92772-7bad-11eb-a254-e3ebfda7d7ba.html. Archived from the original on 2022-03-19.
{{cite web}}: Missing or empty|title=(help) - ↑ 12.00 12.01 12.02 12.03 12.04 12.05 12.06 12.07 12.08 12.09 12.10 12.11 12.12 12.13 (PDF) https://web.archive.org/web/20230608131748/https://img1.wsimg.com/blobby/go/bc4a40d5-1a76-4654-84f2-2ccc756eabf0/TTIS%20Acquisition%20Press%20Release%20Website%20Version.pdf. Archived from the original (PDF) on 2023-06-08.
{{cite web}}: Missing or empty|title=(help) - ↑ https://web.archive.org/web/20240119072743/https://www.steelorbis.com/steel-news/latest-news/tt-iron-steel-company-acquiresarcelormittalspoint-lisas-iron-and-steel-mill-1293566.htm. Archived from the original on 2024-01-19.
{{cite web}}: Missing or empty|title=(help) - ↑ 14.0 14.1 14.2 14.3 14.4 14.5 https://web.archive.org/web/20240125061232/https://ttiron.com/. Archived from the original on 2024-01-25.
{{cite web}}: Missing or empty|title=(help) - ↑ 15.0 15.1 https://web.archive.org/web/20220922012405/https://www.sec.gov/Archives/edgar/data/1243429/000119312511204773/dex991.htm. Archived from the original on 2022-09-22.
{{cite web}}: Missing or empty|title=(help) - ↑ 16.00 16.01 16.02 16.03 16.04 16.05 16.06 16.07 16.08 16.09 16.10 https://energynow.tt/blog/request-for-expressions-of-interest-sale-of-steel-plant.
{{cite web}}: Missing or empty|title=(help) - ↑ 17.0 17.1 17.2 17.3 https://web.archive.org/web/20220922034435/https://books.google.com/books?id=IrZFBAAAQBAJ&pg=RA4-PA77&lpg=RA4-PA77&dq=arcelormittal+point+lisas+%22crude+steel%22&source=bl&ots=MefLGVy7U1&sig=ACfU3U0Zvpgw_7rwsKNRpBvsCFao2ssF9g&hl=en&sa=X&ved=2ahUKEwiSodr0kYr1AhW8jYkEHV3RBEMQ6AF6BAgIEAM. Archived from the original on 2022-09-22.
{{cite web}}: Missing or empty|title=(help) - ↑ 18.0 18.1 18.2 18.3 18.4 "2022 World Direct Reduction Statistics" (PDF). Midrex. 2023-09-12. Archived from the original (PDF) on 2023-11-03.
- ↑ 19.0 19.1 19.2 19.3 19.4 19.5 19.6 https://imis.aist.org/store/detail.aspx?id=PR-RU2022-2.
{{cite web}}: Missing or empty|title=(help) - ↑ 20.0 20.1 20.2 20.3 20.4 20.5 20.6 20.7 (PDF) https://www.midrex.com/wp-content/uploads/MidrexStatsBook2024.pdf.
{{cite web}}: Missing or empty|title=(help) - ↑ 21.0 21.1 21.2 https://www.midrex.com/tech-article/future-processing-options-for-hydrogen-dri/.
{{cite web}}: Missing or empty|title=(help) - ↑ 22.0 22.1 22.2 22.3 22.4 22.5 22.6 https://ttironsteel.com/.
{{cite web}}: Missing or empty|title=(help) - ↑ 23.0 23.1 23.2 23.3 (PDF) https://cdn.centralbank.org.bb/documents/2022-02-22-05-55-44-WP1997v1-18.pdf.PDF.
{{cite web}}: Missing or empty|title=(help) - ↑ 24.0 24.1 https://imis.aist.org/store/detail.aspx?id=PR-RU2022-1.
{{cite web}}: Missing or empty|title=(help) - ↑ 25.0 25.1 (PDF) https://web.archive.org/web/20220318083849/http://www.midrex.com/wp-content/uploads/Midrex-Plants-Sheet2021-1.pdf. Archived from the original (PDF) on 2022-03-18.
{{cite web}}: Missing or empty|title=(help) - ↑ 26.0 26.1 26.2 26.3 26.4 26.5 https://www.guardian.co.tt/business/point-lisas-steel-plant-to-be-restarted-six-years-after-closure-6.2.1568133.650ce5c301.
{{cite web}}: Missing or empty|title=(help)