Pometeno Brdo (ENCRO ZD2) solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Pometeno Brdo (ENCRO ZD2) solar farm is a shelved solar photovoltaic (PV) farm in Split-Dalmatia County, Croatia.

Project Details

Table 1: Phase-level project details for Pometeno Brdo (ENCRO ZD2) solar farm

Status Nameplate capacity Technology Owner
Shelved (inferred March 2023) 50 MW[1] PV[1] ENCRO ZD2[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Pometeno Brdo (ENCRO ZD2) solar farm

Location Coordinates (WGS 84)
Split-Dalmatia County, Croatia[2] 43.6180, 16.4518 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 https://balkangreenenergynews.com/six-companies-submit-applications-to-install-257-mw-of-pv-plants-in-croatia/. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://mingor.gov.hr/UserDocsImages/UPRAVA-ZA-PROCJENU-UTJECAJA-NA-OKOLIS-ODRZIVO-GOSPODARENJE-OTPADOM/Opuo/18_07_2019_Elaborat_SE_Pometeno_brdo.pdf. {{cite web}}: Missing or empty |title= (help)