Porís De Abona wind farm
From Global Energy Monitor
This article is part of the Global Wind Power Tracker, a Global Energy Monitor project. |
Porís De Abona wind farm is an operating wind farm in Arico, Tenerife, Santa Cruz de Tenerife, Las Islas Canarias, Spain.
Project Details
Table 1: Phase-level project details for Porís De Abona wind farm
Phase name | Status | Commissioning year | Nameplate capacity | Type | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2018[1] | 20 MW[1] | Onshore[1] | Alas Capital SA [100%][2] | Energía Eólica y Fotovoltaica de Canarias[3] |
2 | Cancelled (inferred April 2024) | – | 11 MW[4] | Onshore[4] | – | Energías Renovables Eólica y Fotovoltaica de Canarias[4] |
Location
Table 2: Phase-level location details for Porís De Abona wind farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Arico, Tenerife, Santa Cruz de Tenerife, Las Islas Canarias, Spain[5] | 28.1524, -16.4802 (approximate)[5] |
2 | Arico, Tenerife, Santa Cruz de Tenerife, Las Islas Canarias, Spain[4] | 28.1291, -16.7593 (approximate)[4] |
The map below shows the approximate locations of the wind farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 (PDF) https://web.archive.org/web/20240126042222/https://www.gobiernodecanarias.org/cmsweb/export/sites/energia/doc/Publicaciones/AnuarioEnergeticoCanarias/20210219_AnuarioEnergeticoCanarias2019.pdf. Archived from the original (PDF) on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ (PDF) https://web.archive.org/web/20240126050958/https://www.miteco.gob.es/content/dam/miteco/es/energia/files-1/renovables/subastas-convocatorias/SiteAssets/Resolucion-segunda-convocatoria-eolica-Canarias.pdf. Archived from the original (PDF) on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ https://web.archive.org/web/20240131075600/https://www.boe.es/diario_boe/txt.php?id=BOE-B-2018-22726. Archived from the original on 2024-01-31.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 4.0 4.1 4.2 4.3 4.4 https://web.archive.org/web/20240126052119/https://www.gobiernodecanarias.org/boc/2020/244/024.html. Archived from the original on 2024-01-26.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 5.0 5.1 https://web.archive.org/web/20240201021440/https://www.thewindpower.net/windfarm_en_31906.php. Archived from the original on 2024-02-01.
{{cite web}}
: Missing or empty|title=
(help)