Poso Extension Stage 2 hydroelectric plant
From Global Energy Monitor
Part of the Global Hydropower Tracker, a Global Energy Monitor project. |
Poso Extension Stage 2 hydroelectric plant is an operating hydroelectric power plant in Sulewana, North Pamona District, Poso Regency, Central Sulawesi, Indonesia.
Project Details
Table 1: Project details for Poso Extension Stage 2 hydroelectric plant
Status | Commissioning year | Nameplate capacity | Turbines | Technology type | Owner |
---|---|---|---|---|---|
Operating[1] | 2021[1] | 200 MW[2] | 4 x 50 MW[2] | Run-of-river[2] | PT Poso Energy[2] |
Location
Table 2: Location details for Poso Extension Stage 2 hydroelectric plant
Location | River | Coordinates (WGS 84) |
---|---|---|
Sulewana, North Pamona District, Poso Regency, Central Sulawesi, Indonesia[2] | Poso River[2] | -1.6442, 120.6471 (exact)[2] |
The map below shows the exact location of the hydroelectric power plant:
Articles and Resources
Additional data
To access additional data, including an interactive map of global hydroelectric power plants, a downloadable dataset, and summary data, please visit the Global Hydropower Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 https://www.jakartadaily.id/resources/pr-1622162174/pln-finalizes-poso-hydropower-stage-2-in-sulawesi.
{{cite web}}
: Missing or empty|title=
(help) - ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://issuu.com/gobelenrico/docs/kalla_project_profile_draft_11_okt_b.
{{cite web}}
: Missing or empty|title=
(help)