Ptolemaida Lignite Mine Orycheio solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Ptolemaida Lignite Mine Orycheio solar farm (Ορυχειο Δεη Πτολεμαιδα, Φοίβη) is a solar photovoltaic (PV) farm under construction in Kozani, Kozani Regional Unit, Epirus and Western Macedonia, Greece.

Project Details

Table 1: Phase-level project details for Ptolemaida Lignite Mine Orycheio solar farm

Status Nameplate capacity Technology Owner
Construction[1] 550 MWp/dc[2] PV[2] Public Power Corporation SA [100%] (ΔΗΜΟΣΙΑ ΕΠΙΧΕΙΡΗΣΗ ΗΛΕΚΤΡΙΣΜΟΥ ΑΕ)[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Ptolemaida Lignite Mine Orycheio solar farm

Location Coordinates (WGS 84)
Kozani, Kozani Regional Unit, Kozani Regional Unit, Epirus and Western Macedonia, Greece[2] 40.4166, 21.8245 (exact)[2]

The map below shows the exact location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. ↑ https://www.ot.gr/2025/10/22/epixeiriseis/dei-i-prasini-epanastasi-ksekina-apo-ti-dytiki-makedonia/. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.0 2.1 2.2 2.3 2.4 https://web.archive.org/web/20240126014522/https://geo.rae.gr/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)