Qiketai Mining Area Resource Integration Zone No. 1 Integrated Mine

From Global Energy Monitor

Qiketai Mining Area Resource Integration Zone No. 1 Integrated coal mine (鄯善县泰鑫坤德煤业有限公司七克台矿区资源整合区一号整合井田) is a proposed mine, with a designed production capacity is 1.5 million tonnes per year, located in Shanshan County, Turpan City, Xinjiang, China.[1]

Location

The undated satellite photo below shows the approximate location of the coal mine in Shanshan County, Turpan City, Xinjiang, China.

Loading map...

Coal Mine Background

Project Details

  • Sponsor: Shanshan County Taixin Kunde Coal Industry Co., Ltd.
  • Parent Company: Wang Xiaoyong[2]
  • Location: Shanshan County, Turpan City, Xinjiang, China
  • GPS Coordinates: 42.996408, 90.654712 (approximate)
  • Status: Proposed
  • Production Capacity: 1.5 Mt/year
  • Workforce Size:
  • Coal Field:
  • Total Resource:
  • Mineable Reserves:
  • Coal Type:
  • Mine Size:
  • Mine Type: Underground
  • Start Year:
  • Source of Financing:

Articles and resources

References

Related GEM.wiki articles