Qilu Dushan power station
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
Qilu Dushan power station (路鑫能源独山齐鲁热电联产) is a cancelled power station in Mawei Town, Dushan County, Qiannan AP, Guizhou, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
Qilu Dushan power station | Mawei Town, Dushan County, Qiannan AP, Guizhou, China | 25.816667, 107.55 (approximate) |
The map below shows the approximate location of the power station.
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology | Start year | Retired year |
---|---|---|---|---|---|---|
Phase I Unit 1 | cancelled | coal - unknown | 350 | unknown | – | – |
Phase I Unit 2 | cancelled | coal - unknown | 350 | unknown | – | – |
Phase II Unit 3 | cancelled | coal - unknown | 350 | unknown | – | – |
Phase II Unit 4 | cancelled | coal - unknown | 350 | unknown | – | – |
Table 3: Unit-level ownership and operator details
Unit name | Owner |
---|---|
Phase I Unit 1 | Shanxi Luxin Energy Group Co Ltd [100.0%] |
Phase I Unit 2 | Shanxi Luxin Energy Group Co Ltd [100.0%] |
Phase II Unit 3 | Shanxi Luxin Energy Group Co Ltd [100.0%] |
Phase II Unit 4 | Shanxi Luxin Energy Group Co Ltd [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): other metals & mining
- Captive industry: Both
Background on Project
Shanxi Luxin Group has proposed a captive coal-fired power station of four 350 MW units in Dushan County to support steel production. The first two units are planned for operation by December 2015, and the second two in 2018.[1][2]
Although the project is listed as a provincial key project in 2014,[3] it disappeared from the list of Qiannan AP key projects in 2017, indicating its uncertain future.[4]
Articles and Resources
References
- ↑ "总投资55亿元的自备电厂和矿产品交易市场在麻尾正式开工建设," accessed July 2015
- ↑ "独山县麻尾工业园区简介," 独山县工业与信息化局, 2012/9/27
- ↑ "2014年贵州省重大工程和重点项目名单," Government of Guizhou, 2015-10-14
- ↑ "黔南州2017年重大工程和重点项目名单," Government of Qianan AP, 2017-03-21