Qilu Works power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Qilu Works power station (齐鲁石化热电厂) is an operating power station of at least 190-megawatts (MW) in Sinopec Qilu plant, Linzi, Zibo, Shandong, China with multiple units, some of which are not currently operating. It is also known as 中国石油化工股份有限公司齐鲁分公司1#-8#热电机组背压替代改造项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Qilu Works power station | Sinopec Qilu plant, Linzi, Zibo, Shandong, China | 36.7852045, 118.2130666 (exact)[1] |
Unit-level coordinates (WGS 84):
- New Unit 1, New Unit 2, New Unit 3, Unit 01, Unit 02, Unit 03, Unit 04, Unit 05, Unit 06, Unit 07, Unit 08: 36.7852045, 118.2130666
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Start year | Retired year | Emergency/Backup |
|---|---|---|---|---|---|---|---|---|
| New Unit 1 | Construction[2] | coal: bituminous[3][1] | 80[1] | subcritical[1] | yes[1] | – | – | False |
| New Unit 2 | Construction[2] | coal: bituminous[3][1] | 80[1] | subcritical[1] | yes[1] | – | – | False |
| New Unit 3 | Construction[2] | coal: unknown[3][1] | 80[1] | subcritical[1] | yes[1] | – | – | False |
| Unit 01 | Retired | coal: bituminous[3] | 60 | subcritical | yes | 1987 | 2018 | False |
| Unit 02 | Retired | coal: bituminous[3] | 60 | subcritical | yes | 1987 | 2019 | False |
| Unit 03 | Operating | coal: bituminous[3] | 60 | subcritical | yes | 1987 | 2021 (planned) | False |
| Unit 04 | Operating | coal: bituminous[3] | 60 | subcritical | yes | 1987 | 2021 (planned) | False |
| Unit 05 | Retired[4][5] | coal: bituminous[3] | 65 | subcritical | yes | 1987 | 2023[4] | False |
| Unit 06 | Operating | coal: bituminous[3] | 70 | subcritical | yes | 1995 | – | False |
| Unit 07 | Retired[6] | coal: bituminous[3] | 60 | subcritical | yes | 2005 | 2023 | False |
| Unit 08 | Retired[6] | coal: bituminous[3] | 60 | subcritical | yes | 2005 | 2023 | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| New Unit 1 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| New Unit 2 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| New Unit 3 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| Unit 01 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| Unit 02 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| Unit 03 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| Unit 04 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| Unit 05 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| Unit 06 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| Unit 07 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
| Unit 08 | China Petroleum and Chemical Co Ltd QILU Branch [100%][1] | China Petrochemical Corp [100.0%] |
Project-level captive use details
- Captive industry use (heat or power): both[1]
- Captive industry: Chemicals[1]
- Non-industry use: heat[1]
Project-level coal details
- Coal source(s): imported
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Background
The power station has a mix of operating, retired, and proposed capacity.[7]
120 MW of capacity was retired at the plant from 2018-2019.[8]
A 70 MW unit was reportedly started up in 1995.[9] Units 9-14 appear to be six units with 25 MW each.[10]
160 MW of new capacity was proposed at the station and appeared to be under pre-permit development.[11]
In June 2023, the Shandong Provincial Party Committee and the Provincial Government approved the construction of a 3 x 80 MW expansion project.[12]
The new replacement units have been actively under construction. In 2023, the project was featured in feasibility studies and environmental impact assessments.[13]
In 2024, the project was included in Shandong's key project list, and the construction ceremony for the new 3×80MW back‑pressure units was held in May.[14] The older units (1–8) have been subject to various status changes, with some retired and others, like Units 7 and 8, listed for retirement in 2023.[15]
By May 2025, the project was reported to have commenced construction in 2024 and was progressing in two phases.[16] In July 2025, electrical installation began,[17] and by June 2026, the new Unit 1 had successfully completed a test run and grid connection.[18]
Articles and Resources
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 1.23 1.24 1.25 1.26 "齐鲁石化煤电机组替代改造项目获批". qlsh.sinopec.com. 2024-01-15. Archived from the original on 2024-05-14. Retrieved 2024-05-13.
{{cite web}}: Text "齐鲁石化公司" ignored (help) - ↑ 2.0 2.1 2.2 "齐鲁石化3台8万千瓦背压机组项目开工". 2025-05-12. Archived from the original on 2025-12-05. Retrieved 2025-11-27.
- ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.0 4.1 "头条聚焦!一批淘汰关停燃煤机组名单公示". Weixin Official Accounts Platform. 2023-11-08. Archived from the original on 2024-01-25. Retrieved 2023-11-08.
- ↑ "山东省能源局 通知公告 关于淄博、临沂、济宁、泰安、济南市2023年已淘汰关停燃煤机组名单的公示". nyj.shandong.gov.cn. 2023-11-01. Archived from the original on 2024-01-25. Retrieved 2023-11-08.
- ↑ 6.0 6.1 https://web.archive.org/web/20240218195629/http://nyj.shandong.gov.cn/art/2023/12/29/art_59960_10302416.html. Archived from the original on 2024-02-18.
{{cite web}}: Missing or empty|title=(help) - ↑ http://www.sinopecnews.com.cn/b2b/content/2020-02/27/content_1792161.htm
- ↑ "山东省2019年燃煤机组关停名单," Shandong, undated
- ↑ "山东省七部门联合印发新一轮燃煤机组关停通知 附:关停及改造名单," Power.IN, 2021-04-14
- ↑ "齐鲁石化分公司热电厂 1#-4#机组背压替代改造工程环境影响评价第一次公示," undated
- ↑ 齐鲁石化分公司热电厂 1#-4#机组背压替代改造工程 环境影响评价第一次公示, qlsh.sinopec.com, May 16, 2019
- ↑ 齐鲁分公司1#-8#热电机组背压替代改造项目(一期工程)环境影响评价第二次公众参与信息公示 qlsh.sinopec.com, November 15, 2023
- ↑ "齐鲁分公司1#-8#热电机组背压替代改造项目(一期工程)环境影响评价第二次公众参与信息公示". 中国石化齐鲁石化公司. 2023-11-15. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "齐鲁石化新建3台8万千瓦背压机组项目开工". 百家号. 2024-05-12. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "关于淄博、临沂、济宁、泰安、济南市2023年已淘汰关停燃煤机组名单的公示". 山东省能源局. 2023-11-01. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "初春的齐鲁石化1-8号热电机组背压替代改造项目现场机械轰鸣". 百家号. 2025-05-28. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "齐鲁石化1-4号热电机组背压替代改造项目110千伏03号变压器安全吊装就位". 中国石化十建公司. 2025-07-16. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "齐鲁石化1#-8#热电机组背压替代改造项目新1号机组试机并网发电一次成功". 豪华建设. 2026-06-04. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.