Qilu Works power station (齐鲁石化热电厂) is an operating power station of at least 190-megawatts (MW) in Sinopec Qilu plant, Linzi, Zibo, Shandong, China with multiple units, some of which are not currently operating. It is also known as 中国石油化工股份有限公司齐鲁分公司1#-8#热电机组背压替代改造项目.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Qilu Works power station Sinopec Qilu plant, Linzi, Zibo, Shandong, China 36.7852045, 118.2130666 (exact)

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • New Unit 1, New Unit 2, New Unit 3, Unit 01, Unit 02, Unit 03, Unit 04, Unit 05, Unit 06, Unit 07, Unit 08: 36.7852045, 118.2130666

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Retired year
New Unit 1 permitted coal - bituminous 80 subcritical
New Unit 2 permitted coal - bituminous 80 subcritical
New Unit 3 permitted coal - unknown 80 subcritical
Unit 01 retired coal - bituminous 60 subcritical 1987 2018
Unit 02 retired coal - bituminous 60 subcritical 1987 2019
Unit 03 operating coal - bituminous 60 subcritical 1987 2021 (planned)
Unit 04 operating coal - bituminous 60 subcritical 1987 2021 (planned)
Unit 05 retired[1][2] coal - bituminous 65 subcritical 1987 2023[1]
Unit 06 operating coal - bituminous 70 subcritical 1995
Unit 07 retired[3] coal - bituminous 60 subcritical 2005 2023
Unit 08 retired[3] coal - bituminous 60 subcritical 2005 2023

Table 3: Unit-level ownership and operator details

Unit name Owner
New Unit 1 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
New Unit 2 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
New Unit 3 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
Unit 01 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
Unit 02 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
Unit 03 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
Unit 04 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
Unit 05 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
Unit 06 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
Unit 07 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]
Unit 08 China Petroleum and Chemical Co Ltd QILU Branch [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): chemicals
  • Captive industry: Both

Project-level coal details

  • Permit(s): June 19, 2023

Background

The power station has a mix of operating, retired, and proposed capacity.[4]

120 MW of capacity was retired at the plant from 2018-2019.[5]

A 70 MW unit was reportedly started up in 1995.[6] Units 9-14 appear to be six units with 25 MW each.[7]

160 MW of new capacity was proposed at the station and appeared to be under pre-permit development.[8]

In June 2023, the Shandong Provincial Party Committee and the Provincial Government approved the construction of a 3 x 80 MW expansion project.[9]

Articles and Resources

References

  1. 1.0 1.1 https://web.archive.org/web/20240125131234/https://mp.weixin.qq.com/s/-smkBFGoEYyK3NkQQG1Zog. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. https://web.archive.org/web/20240125131241/http://nyj.shandong.gov.cn/art/2023/11/1/art_59960_10301454.html. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240218195629/http://nyj.shandong.gov.cn/art/2023/12/29/art_59960_10302416.html. Archived from the original on 18 February 2024. {{cite web}}: Missing or empty |title= (help)
  4. http://www.sinopecnews.com.cn/b2b/content/2020-02/27/content_1792161.htm
  5. "山东省2019年燃煤机组关停名单," Shandong, undated
  6. "山东省七部门联合印发新一轮燃煤机组关停通知 附:关停及改造名单," Power.IN, 2021-04-14
  7. "齐鲁石化分公司热电厂 1#-4#机组背压替代改造工程环境影响评价第一次公示," undated
  8. 齐鲁石化分公司热电厂 1#-4#机组背压替代改造工程 环境影响评价第一次公示, qlsh.sinopec.com, May 16, 2019
  9. 齐鲁分公司1#-8#热电机组背压替代改造项目(一期工程)环境影响评价第二次公众参与信息公示 qlsh.sinopec.com, November 15, 2023