Qinhuangdao-2 power station (秦皇岛热电厂) is an operating power station of at least 1900-megawatts (MW) in Jianshe Avenue, Haigang, Qinhuangdao, Hebei, China with multiple units, some of which are not currently operating. It is also known as 河北建投神华国能秦皇岛发电厂 (Unit 1 & 2, Unit 3 & 4), 国电电力秦皇岛公司2×350MW燃煤机组扩建工程 (New Unit 1 & 2), 河北建投秦皇岛秦热发电厂 (Unit 5 & 6), 河北建投神华国能秦皇岛发电公司一期等容量替代发电项目 (New Unit 1 & 2).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Qinhuangdao-2 power station Jianshe Avenue, Haigang, Qinhuangdao, Hebei, China 39.945305, 119.6430272 (exact)[1]
Loading map...

Unit-level coordinates (WGS 84):

  • Replace Unit 1 (Unit 7), Replace Unit 2 (Unit 8), Unit 1, Unit 2, Unit 3, Unit 4, Unit 5, Unit 6: 39.945305, 119.6430272

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Retired year Emergency/Backup
Replace Unit 1 (Unit 7) Operating[2][3] coal: bituminous[4][1] 350[1] supercritical[1] yes[1] 2025[5] – False
Replace Unit 2 (Unit 8) Operating[6][3] coal: bituminous[4][1] 350[5] supercritical[5] yes[5] 2026[6][5] – False
Unit 1 Retired[7] coal: bituminous[4] 215 subcritical yes 1992 2025[7] False
Unit 2 Mothballed coal: bituminous[4] 215 subcritical yes 1993 2025 (planned) False
Unit 3 Operating coal: bituminous[4] 300 subcritical yes 1996 – False
Unit 4 Operating coal: bituminous[4] 300 subcritical yes 1996 – False
Unit 5 Operating coal: bituminous[4] 300 subcritical yes 2007 – False
Unit 6 Operating coal: bituminous[4] 300 subcritical yes 2007 – False

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
Replace Unit 1 (Unit 7) Qinhuangdao Power Generation Co Ltd [100%][1] China Energy Investment Corp [50.0%]; Hebei Construction & Investment Group Co Ltd [50.0%]
Replace Unit 2 (Unit 8) Qinhuangdao Power Generation Co Ltd [100%][1] China Energy Investment Corp [50.0%]; Hebei Construction & Investment Group Co Ltd [50.0%]
Unit 1 Qinhuangdao Power Generation Co Ltd [100%] China Energy Investment Corp [50.0%]; Hebei Construction & Investment Group Co Ltd [50.0%]
Unit 2 Qinhuangdao Power Generation Co Ltd [100%] China Energy Investment Corp [50.0%]; Hebei Construction & Investment Group Co Ltd [50.0%]
Unit 3 Qinhuangdao Power Generation Co Ltd [100%] China Energy Investment Corp [50.0%]; Hebei Construction & Investment Group Co Ltd [50.0%]
Unit 4 Qinhuangdao Power Generation Co Ltd [100%] China Energy Investment Corp [50.0%]; Hebei Construction & Investment Group Co Ltd [50.0%]
Unit 5 Qinhuangdao Qinre Power Generation Co Ltd [100%] Hebei Construction Investment Energy Investment Co Ltd [40.0%]; Jinneng Holding Shanxi Electric Power Co Ltd [40.0%]; Qinhuangdao Thermal Power Investment Management Center [20.0%]
Unit 6 Qinhuangdao Qinre Power Generation Co Ltd [100%] Hebei Construction Investment Energy Investment Co Ltd [40.0%]; Jinneng Holding Shanxi Electric Power Co Ltd [40.0%]; Qinhuangdao Thermal Power Investment Management Center [20.0%]

Project-level coal details

  • Coal source(s): domestic

Background

Qinhuangdao-2 power station is a six-unit coal-fired power plant with a total capacity of 1,630 MW. The plant was completed between 1992 and 2007, and is majority-owned by Hebei Construction & Investment Group.[8]

Expansion project

Two new units of 350 MW each are planned to replace units 1-2 of the power station. The project was on 2023 Hebei provincial key construction projects list.[9]

As of March 2021, plans for the new units was undergoing feasibility studies.[10] By the end of August 2023, no permit information could be found apart from various calls for bidding.[11][12]

The replacement units (Unit 7 and 8) are now operational. In 2023, the project was permitted, and construction began.[13]

In 2024, the project appeared on Hebei's key projects list, and by June, the first concrete was poured.[14][15] The old Unit 1 was mothballed in 2024.[16]

In 2025, construction was ongoing, and Unit 7 was retired from its backup role in October 2025.[17]

By early 2026, both new units (7 and 8) successfully passed 168‑hour full‑load trials.[18][19][20]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 "国能2×350兆瓦等容量替代热电联产项目正式开工". Weixin Official Accounts Platform. 2023-10-28. Archived from the original on 2024-01-25. Retrieved 2023-10-30.
  2. ↑ https://news.bjx.com.cn/html/20251231/1477425.shtml. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.0 3.1 https://mp.weixin.qq.com/s/FyLKwbBjnozbtVePOTc48Q. {{cite web}}: Missing or empty |title= (help)
  4. ↑ 4.0 4.1 4.2 4.3 4.4 4.5 4.6 4.7 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.0 5.1 5.2 5.3 5.4 "国能秦皇岛热电厂2×350MW等容量替代热电联产项目开工-北极星火力发电网". news.bjx.com.cn. 2023-10-27. Archived from the original on 2024-01-25. Retrieved 2023-10-30.
  6. ↑ 6.0 6.1 https://news.bjx.com.cn/html/20260202/1482223.shtml. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.0 7.1 https://news.bjx.com.cn/html/20251023/1466372.shtml. {{cite web}}: Missing or empty |title= (help)
  8. ↑ Qinhuangdao-2 Powerplant, Enipedia, accessed Sept. 2015.
  9. ↑ "河北省公布2023年重点建设项目名单". 河北省发展改革委. 2023-01-31. Retrieved 2023-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  10. ↑ "秦皇岛发电有限责任公司2×350MW等容量替代热电联产项目(更新资讯.," Sohu, 2021-04-23
  11. ↑ "国电电力秦皇岛公司2×350MW等容量替代热电联产项目相关的2项招标". 北极星电力网. 2023-07-27. Retrieved 2023-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  12. ↑ "【招标】2×350MW!国电电力秦皇岛项目2项招标". 能源电力新观察. 2023-07-27. Retrieved 2023-9-7. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  13. ↑ "国能秦皇岛热电厂2×350MW等容量替代热电联产项目开工". 北极星电力网. 2023-10-27. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  14. ↑ "河北省2024年省重点建设项目名单". 北极星电力网. 2024-04-02. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  15. ↑ "秦皇岛发电有限责任公司2×350MW等容量替代热电联产项目7号锅炉第一根钢架顺利吊装就位". 微信公众号. 2024-08-28. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  16. ↑ "关于2024年河北省火电行业淘汰落后产能目标任务完成情况的公告". 河北省发改委. 2025-03-24. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  17. ↑ "关于秦皇岛发电有限责任公司1号机组退出应急备用电源有关事宜的公示". 北极星电力网. 2025-10-23. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  18. ↑ "国能秦皇岛公司2×350兆瓦热电联产等容量替代项目7号机组顺利通过168小时满负荷试运行". 微信公众号. 2026-01-05. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  19. ↑ "中国能建天津电建承建的河北秦皇岛项目8号机组首次并网一次成功". 北极星电力网. 2026-01-09. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)
  20. ↑ "国能秦皇岛公司2×350兆瓦等容量替代热电联产项目8号机组顺利通过168小时满负荷试运行". 微信公众号. 2026-03-06. Retrieved 2026-07-30.{{cite web}}: CS1 maint: url-status (link)