Quanhui B cogen power station
| Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
| Related coal trackers: |
Quanhui B cogen power station (福能股份泉惠热电, 福建泉惠石化工业区东桥热电一期2×660MW, 泉惠石化工业区热电联产(B厂区)) is a power station in Douwei District, Hui'an, Quanzhou, Fujian, China with multiple units of varying statuses, none of which are currently operating. It is also known as 华润泉惠热电, pplc石化工业区2×660MW超超临界热电联产工程(2号机组)项目.
Location
Table 1: Project-level location details
| Plant name | Location | Coordinates (WGS 84) |
|---|---|---|
| Quanhui B cogen power station | Douwei District, Hui'an, Quanzhou, Fujian, China | 25.041606, 118.923025 (exact)[1] |
Unit-level coordinates (WGS 84):
- Phase I Unit 1, Phase I Unit 2, Phase II Unit 3, Phase II Unit 4: 25.041606, 118.923025
Project Details
Table 2: Unit-level details
| Unit name | Status | Fuel(s) | Capacity (MW) | Technology | CHP | Emergency/Backup |
|---|---|---|---|---|---|---|
| Phase I Unit 1 | Construction[2] | coal: unknown[3][4] | 660[4] | ultra-supercritical[4] | yes[4] | False |
| Phase I Unit 2 | Construction[2] | coal: unknown[3][4] | 660[4] | ultra-supercritical[4] | yes[4] | False |
| Phase II Unit 3 | Permitted[5] | coal: unknown[5][3] | 650[5] | ultra-supercritical[5] | – | False |
| Phase II Unit 4 | Permitted[5] | coal: unknown[5][3] | 650[5] | ultra-supercritical[5] | – | False |
Table 3: Unit-level ownership and operator details
| Unit name | Owner | Parent |
|---|---|---|
| Phase I Unit 1 | Fujian Hui'an Quanhui Power Generation Co Ltd [100%][4] | Sinochem Corp [46.8%]; Fujian Funeng Co Ltd [35.0%]; Agricultural Bank of China Investment Co Ltd [5.2%]; Fujian Hui'an City State Owned Capital Operation Group Co Ltd [5.0%]; unknown [4.9%]; ICBC Investment [3.1%] |
| Phase I Unit 2 | Fujian Hui'an Quanhui Power Generation Co Ltd [100%][4] | Sinochem Corp [46.8%]; Fujian Funeng Co Ltd [35.0%]; Agricultural Bank of China Investment Co Ltd [5.2%]; Fujian Hui'an City State Owned Capital Operation Group Co Ltd [5.0%]; unknown [4.9%]; ICBC Investment [3.1%] |
| Phase II Unit 3 | Fujian Hui'an Quanhui Power Generation Co Ltd [100%][4] | Sinochem Corp [46.8%]; Fujian Funeng Co Ltd [35.0%]; Agricultural Bank of China Investment Co Ltd [5.2%]; Fujian Hui'an City State Owned Capital Operation Group Co Ltd [5.0%]; unknown [4.9%]; ICBC Investment [3.1%] |
| Phase II Unit 4 | Fujian Hui'an Quanhui Power Generation Co Ltd [100%][4] | Sinochem Corp [46.8%]; Fujian Funeng Co Ltd [35.0%]; Agricultural Bank of China Investment Co Ltd [5.2%]; Fujian Hui'an City State Owned Capital Operation Group Co Ltd [5.0%]; unknown [4.9%]; ICBC Investment [3.1%] |
Project-level coal details
- Coal source(s): domestic
- Permit(s): First permit 闽发改网能源函[2016]37号, then 2022-6-9 闽发改网审能源〔2022〕112号,
2024-4-8 闽发改网审能源函〔2024〕40号[4], 闽发改网能源函[2016]37号 闽发改网审能源〔2022〕112号[4]
Background
Progress on Phase I was slow, but Phase II was permitted in 2024. In 2023, there was a ground‑breaking ceremony.[6]
In early 2024, ownership changes and delays were reported, followed by project approval in April and a board resolution to invest in May.[7][8] Equipment tenders were issued in mid‑2024.[9]
In 2025, the project appeared on construction lists, and main contracts were awarded in February, with construction starting in earnest in May.[10][11] In 2026, the project reached milestones like boiler hoisting and roof sealing.[12]
For Phase II (Units 3 and 4), the project was permitted in September 2024, feasibility studies were conducted, and the environmental impact assessment was approved in early 2025.[13][14] Equipment technical discussions and tenders occurred in late 2025 and early 2026, with EPC tenders issued in July 2026.[15]
Ownership Tree
This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.
Articles and Resources
References
- ↑ https://mp.weixin.qq.com/s/iQ2M4ldp-msUJSrgEe2X1A.
{{cite web}}: Missing or empty|title=(help) - ↑ 2.0 2.1 https://mp.weixin.qq.com/s/i5Z_Y7zo1u7u6Q-D0d61Dg.
{{cite web}}: Missing or empty|title=(help) - ↑ 3.0 3.1 3.2 3.3 https://www.gem.wiki/Coal_source_methodology_for_the_Global_Coal_Plant_Tracker.
{{cite web}}: Missing or empty|title=(help) - ↑ 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 4.11 4.12 4.13 "福建泉惠石化工业区2×660MW超超临界热电联产工程核准事项变更-北极星火力发电网". news.bjx.com.cn. 2024-04-11. Archived from the original on 2024-04-22. Retrieved 2024-04-11.
- ↑ 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 https://news.bjx.com.cn/html/20240902/1398282.shtml.
{{cite web}}: Missing or empty|title=(help) - ↑ "泉惠石化工业区2×660MW超超临界热电联产工程(2号机组)项目举行动工仪式". 北极星电力网. 2023-12-25. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "福建省发改委发布关于泉惠石化工业区2×660MW超超临界热电联产工程(2号机组)项目核准事项变更的批复". 北极星电力网. 2024-04-11. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "福能股份召开第十届董事会第二十六次临时会议,审议通过《关于投资建设泉惠热电联产项目的议案》". 北极星电力网. 2024-05-13. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "泉惠石化工业区2×660MW超超临界热电联产工程三大主机设备中标公示". 北极星电力网. 2024-07-02. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "福建泉惠石化工业区东桥热电一期2×660MW超超临界热电联产工程1号机组建筑安装工程合同". 微信公众号. 2025-03-07. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "泉惠石化工业区2 ×660MW超超临界热电联产工程项目举行2号锅炉基础第一罐混凝土浇筑仪式". 微信公众号. 2025-05-16. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "泉惠石化工业区2×660MW 超超临界热电联产项目2号锅炉受热面首次吊装一次成功". 微信公众号. 2026-04-28. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "福能股份公告:泉惠石化工业区热电联产二期工程项目核准的批复". 北极星电力网. 2024-09-02. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "福建省生态环境厅发布关于泉惠石化工业区热电联产二期工程项目环境影响报告书的批复". 微信公众号. 2025-03-11. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link) - ↑ "泉惠石化工业区热电联产二期工程项目EPC总承包工程招标公告". 微信公众号. 2026-07-01. Retrieved 2026-07-30.
{{cite web}}: CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.
