Quedlinburg solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Solarpark Quedlinburg P19 106 solar project
Quedlinburg solar farm is an operating solar photovoltaic (PV) farm in Quedlinburg, Unstrut-Hainich-Kreis, Sachsen-Anhalt, Germany.
Project Details
Table 1: Phase-level project details for Quedlinburg solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Operating[1] | 2023[1] | 20 MWp/dc[1] | PV[1] | Anumar [100%][1] | Anumar[1] |
2 | Operating[1] | 2023[1] | 3.4 MWp/dc[1] | PV[1] | Anumar [100%][1] | Anumar[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Quedlinburg solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Quedlinburg, Unstrut-Hainich-Kreis, Quedlinburg, Sachsen-Anhalt, Germany[1] | 51.8100, 11.1233 (exact)[1] |
2 | Quedlinburg, Unstrut-Hainich-Kreis, Quedlinburg, Sachsen-Anhalt, Germany[1] | 51.8100, 11.1233 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 "Marktstammdatenregister (Market master data register)". Germany Federal Network Agency. 2023-02. Archived from the original on 2024-01-25. Retrieved 2023-02.
{{cite web}}
: Check date values in:|access-date=
and|date=
(help)