Quintanilla wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

Quintanilla wind farm is an operating wind farm in Merindad de Río Ubierna, Burgos, Castile and León, Spain.

Project Details

Table 1: Phase-level project details for Quintanilla wind farm

Phase name Status Commissioning year Nameplate capacity Type Owner Operator
1 Operating[1] 2009[2] 20 MW[1] Onshore[1] EDP Renovables España [100%][3] Parques De Generación Eólica[4]
2 Operating[1] 2020[5] 10 MW[1] Onshore[1] EDP Renovables España [100%][3] EDP Renovables España[4]

Location

Table 2: Phase-level location details for Quintanilla wind farm

Phase Name Location Coordinates (WGS 84)
1 Merindad de Río Ubierna, Burgos, Castile and León, Spain[6] 42.5901, -3.6719 (exact)[6]
2 Merindad del Rio Ubierna, Burgos, Castilla y León, Spain[1] 42.3448, -3.6812 (approximate)[1]

The map below shows the locations of the wind farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 (PDF) https://web.archive.org/web/20211204020641/https://energia.jcyl.es/web/jcyl/binarios/56/381/Parques%20E%C3%B3licos%20CyL%2031.12.2020.pdf?blobheader=application%2Fpdf%3Bcharset%3DUTF-8&blobnocache=true. Archived from the original (PDF) on 04 December 2021. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)
  2. https://web.archive.org/web/20240130215506/https://www.elindependiente.com/economia/2020/11/29/los-gigantes-eolicos-de-burgos-que-hacen-pequena-a-la-torre-picasso/. Archived from the original on 2024-01-30. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 https://web.archive.org/web/20240126021306/https://www.edp.com/sites/default/files/2020-04/1Q20%20Operating%20Data.xlsx. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://web.archive.org/web/20240126045317/https://aeeolica.org/sobre-la-eolica/mapa-de-parques-eolicos/castilla-leon/. Archived from the original on 2024-01-26. {{cite web}}: Missing or empty |title= (help)
  5. https://web.archive.org/web/20240130215621/https://www.europapress.es/economia/noticia-edpr-instala-parque-eolico-quintanilla-ii-burgos-mayores-aerogeneradores-espana-20201123105325.html. Archived from the original on 2024-01-30. {{cite web}}: Missing or empty |title= (help)
  6. 6.0 6.1 https://web.archive.org/web/20240201021618/https://www.thewindpower.net/windfarm_en_10560.php. Archived from the original on 2024-02-01. {{cite web}}: Missing or empty |title= (help)