Quitman Solar

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Quitman Solar is an operating solar photovoltaic (PV) farm in Brooks County, Georgia, United States.

Project Details

Table 1: Phase-level project details for Quitman Solar

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2019[1] 150 MWac[1] PV[1] NextEra Energy Inc [100%][2] NextEra Energy[1]
2 Operating[1] 2021[1] 150 MWac[1] PV[1] NextEra Energy Inc [100%][2] NextEra Energy[1]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Quitman Solar

Phase Name Location Coordinates (WGS 84)
1 Brooks County, Georgia, United States[1] 30.849, -83.6433 (exact)[1]
2 Quitman, Brooks County, Georgia, United States[1] 30.862, -83.6517 (exact)[1]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 https://web.archive.org/web/20240125152804/https://www.eia.gov/electricity/data/eia860m/. Archived from the original on 25 January 2024. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://web.archive.org/web/20240206203030/https://pv-magazine-usa.com/2019/07/26/georgia-keeps-the-utility-solar-train-rolling/. Archived from the original on 06 February 2024. {{cite web}}: Check date values in: |archive-date= (help); Missing or empty |title= (help)