REGREP Wind Transaction 3 wind farm

From Global Energy Monitor
This article is part of the
Global Wind Power Tracker, a Global Energy Monitor project.
Report an error

REGREP Wind Transaction 3 wind farm is a cancelled wind farm in Jarar, Somali Region, Ethiopia.

Project Details

Table 1: Phase-level project details for REGREP Wind Transaction 3 wind farm

Status Nameplate capacity Type
Cancelled (inferred July 2023) 100 MW[1] Onshore[1]

Location

Table 2: Phase-level location details for REGREP Wind Transaction 3 wind farm

Location Coordinates (WGS 84)
Jarar, Somali Region, Ethiopia[1] 7.9481, 44.7926 (approximate)[1]

The map below shows the approximate location of the wind farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global wind farms, a downloadable dataset, and summary data, please visit the Global Wind Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 (PDF) https://documents1.worldbank.org/curated/en/363131558922556843/pdf/Ethiopia-Renewable-Energy-Guarantees-Program-Project.pdf. {{cite web}}: Missing or empty |title= (help)