Ramagundam III Coal Mine is an operating coal mine in Telangana, India.

Location

Table 1: Project-level location details

Mine Name Location Coordinates (WGS 84)
Ramagundam III Coal Mine Telangana, India 18.6976, 79.5352 (exact)

The map below shows the exact location of the coal mine:

Loading map...

Project Details

Table 2: Project status

Status Status Detail Opening Year Closing Year
Operating

Table 3: Operation details

Capacity (Mtpa) Production (Mtpa) Year of Production Mine Type Mining Method Mine Size (km2) Mine Depth (m) Workforce Size
9.52[1] 8.159[1] 2022[1] Surface Open Pit 14[1] 170[1] 2228[1]

Table 4: Coal resources and destination

Total Reserves (Mt) Year of Total Reserves Recorded Total Resources (Mt) Coalfield Coal Type Coal Grade Primary Consumer/ Destination
66.12[2] 2023[2] 224[1] Peddapalli Subbituminous Thermal

Table 5: Ownership and parent company

Owner Parent Company Headquarters
The Singareni Collieries Co Ltd[3] Government of Telengana [51%]; Government of India [49%] India

Note: The above section was automatically generated and is based on data from the GEM April 2024 Global Coal Mine Tracker dataset.

Background on Mine

The Ramagundam Opencast -III Coal Mine Project is operated by Singareni Collieries Company Limited, a subsidiary of Coal India, on an area of 1393.81 Ha in village Venkatrao pally Jallaram, Mandal Ramagiri, District Peddapalli, State Telangana, India.[4]

According to its latest environmental statement, the project was accorded with environmental clearance by MoEF, Vide letter No. J11015/23/86-IA dated 17.02.1988 for a rated capacity of 2.75 MTPA, subsequently production was raised from 2.75MTPA to 4.30 MTPA with peak production of 5.0MTPA and mine block area from 442.0 Ha to 756.71 Ha(surface) with total land requirement up to 1393.81 Ha. Environmental Clearance is accorded by Ministry Of Environment and Forests in July 2008 for this extension project. Later again it has been proposed to extend the mine boundary towards south side annexing the property of underground mines i.e. GDK 8 and 8A inclines named as RG OC-III Extension Phase –II Project. It is proposed now to increase the production capacity of the project from 5.0 MTPA to 6.8 MTPA with peak production and mine block area from 756.71 Ha to 1113.30 Ha(surface) with total land requirement up to 2070.10 Ha. Public hearing was conducted on 06th August 2014. Environmental Clearance is accorded by Ministry Of Environment and Forests for this extension project dated 02 March 2021 for a peak production capacity of 8.16 MTPA, again Environmental Clearance is accorded by Ministry Of Environment and Forests for this extension project vide letter .No J11015/43/2013-IA.II (M) dated 16 December 2022 for a peak production capacity of 9.52 MTPA. [5]

Expansion Details

Articles and Resources

Additional data

To access additional data, including an interactive map of world coal mines, a downloadable dataset, and summary data, please visit the Global Coal Mine Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 (PDF) https://scclmines.com/env/docs/ECS/200175.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 (PDF) https://web.archive.org/web/20240123175302/https://scclmines.com/env/docs/ECS/200171.pdf. Archived from the original (PDF) on 23 January 2024. {{cite web}}: Missing or empty |title= (help)
  3. https://scclmines.com/scclnew/our-business_products-and-services_coal-grades.asp. {{cite web}}: Missing or empty |title= (help)
  4. Cite error: Invalid <ref> tag; no text was provided for refs named ECC
  5. Environmental Statement of Ramagundam Opencast-III Expansion Phase-II Coal Mine Project for the year 2022-2023, SCCL, Sept 2023