Rancho Seco Solar
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Rancho Seco Solar is an operating solar photovoltaic (PV) farm in Herald, Sacramento, California, United States.
Project Details
Table 1: Phase-level project details for Rancho Seco Solar
Phase name | Status | Commissioning year | Retired year | Nameplate capacity | Technology | Operator |
---|---|---|---|---|---|---|
1 | Retired[1] | 1984[1] | 2013[1] | 1 MWac[1] | PV[1] | Sacramento Municipal Util Dist[1] |
2 | Retired[1] | 1986[1] | 2013[1] | 1 MWac[1] | PV[1] | Sacramento Municipal Util Dist[1] |
GEN01 | Operating[1] | 2016[1] | – | 10.8 MWac[1] | PV[1] | Rancho Seco Solar[1] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Rancho Seco Solar
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Herald, Sacramento, California, United States[1] | 38.3400, -121.1139 (exact)[1] |
2 | Herald, Sacramento, California, United States[1] | 38.3400, -121.1139 (exact)[1] |
GEN01 | Herald, Sacramento, California, United States[1] | 38.3399, -121.1140 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 1.15 1.16 1.17 1.18 1.19 1.20 1.21 1.22 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00.
{{cite web}}
: Check date values in:|access-date=
(help)