Refineria Talara power station (Central Termoeléctrica Refinería Talara) is an operating power station of at least 102-megawatts (MW) in Pariñas, Talara, Piura, Peru.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Refineria Talara power station Pariñas, Talara, Piura, Peru -4.58393, -81.28213 (exact)[1]

The map below shows the exact location of the power station.

Loading map...


Unit-level coordinates (WGS 84):

  • T1, T2: -4.58393, -81.28213

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year
T1 Operating[2][3][4][5][6] fossil gas: unknown, fossil liquids: naphtha[5] 51[3][5] steam turbine[5] not found 2024[3][5]
T2 Operating[2][3][4][5][6] fossil gas: unknown, fossil liquids: naphtha[5] 51[3][5] steam turbine[5] not found 2024[3][5]

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
T1 GM Operaciones SAC [100%][7][8][9][6] CBEI LLC [50.0%]; Generación Rosario SA [25.0%]; Grupo Albanesi [25.0%]
T2 GM Operaciones SAC [100%][7][8][9][6] CBEI LLC [50.0%]; Generación Rosario SA [25.0%]; Grupo Albanesi [25.0%]

Project-level captive use details

  • Captive industry use (heat or power): power[10]
  • Captive industry: Oil & Refining[10]


Background

The 102 MW Refinería Talara power station comprises a pair of cogeneration units at the Talara refinery on Peru's northwest coast. Construction was completed in late March 2024, and the power plant began operations in April 2024.[11][12] The plant provides electricity for petrochemical processing at the refinery and feeds any excess capacity into Peru's national grid.[12]

Articles and Resources

References

  1. https://goo.gl/maps/5TWh67zbpCdfFf9H8. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 https://elcomercio.pe/economia/peru/petro-peru-refineria-de-talara-proyecto-nunca-opero-al-100-de-su-capacidad-noticia/. {{cite web}}: Missing or empty |title= (help)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 https://www.gob.pe/institucion/minem/noticias/985450-minem-cinco-centrales-de-generacion-iniciaron-operaciones-durante-2024. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 (PDF) https://www.osinergmin.gob.pe/newweb/uploads/Publico/MapaSEIN/informes/proyectos/construccion/202309.pdf. {{cite web}}: Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 5.4 5.5 5.6 5.7 5.8 5.9 "Supervisión de Contratos de Centrales de Generación y Líneas de Transmisión de Energía Eléctrica en Operación" (PDF). Osinergmin. 2024-08-31. Archived from the original (PDF) on 2024-01-25.
  6. 6.0 6.1 6.2 6.3 (PDF) https://web.archive.org/web/20211015230304/https://www.osinergmin.gob.pe/seccion/centro_documental/electricidad/Documentos/Publicaciones/Compendio-Proyectos-GTE-Construccion.pdf. Archived from the original (PDF) on 2021-10-15. {{cite web}}: Missing or empty |title= (help)
  7. 7.0 7.1 https://web.archive.org/web/20240125135646/https://busquedas.elperuano.pe/dispositivo/NL/2215303-1. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  8. 8.0 8.1 https://web.archive.org/web/20240125135846/https://larepublica.pe/economia/2023/09/17/minem-aprueba-transferencia-de-autorizacion-para-central-termica-refineria-talara-369376. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  9. 9.0 9.1 https://web.archive.org/web/20240125114014/https://www.forbesargentina.com/negocios/el-real-madrid-desprenderia-una-sus-superestrellas-caso-fichar-mbappe-quien-seria-victima-n47138. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  10. 10.0 10.1 https://web.archive.org/web/20240125122824/https://www.petroperu.com.pe/nueva-refineria-talara-cuenta-con-moderna-central-termica-autorizada-por-el-minem. Archived from the original on 2024-01-25. {{cite web}}: Missing or empty |title= (help)
  11. "Refinería de Talara: Proyecto nunca llegó a operar al 100%". El Comercio. 2024-04-23.
  12. 12.0 12.1 "MINEM: Cinco centrales de generación iniciaron operaciones durante 2024". Gobierno del Perú. 2024-07-08.{{cite web}}: CS1 maint: url-status (link)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.