Renedo GZ solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Renedo GZ solar farm (Planta solar fotovoltaica Renedo GZ) is a solar photovoltaic (PV) farm in pre-construction in Castronuevo de Esgueva, Valladolid, Castilla y León, Spain.

Project Details

Table 1: Phase-level project details for Renedo GZ solar farm

Status Nameplate capacity Technology Owner Operator
Pre-construction[1] 50 MWp/dc[2] PV[2] Grupo Zaragozá [100%][3] Fotovoltaica Zarafot 4[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Renedo GZ solar farm

Location Coordinates (WGS 84)
Castronuevo de Esgueva, Valladolid, Castilla y León, Spain[2] 41.6842, -4.5935 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. https://energiaestrategica.es/6gw-renovables-castilla-y-leon/ https://bocyl.jcyl.es/html/2023/02/20/html/BOCYL-D-20022023-16.do, https://energiaestrategica.es/6gw-renovables-castilla-y-leon/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 2.4 "RESOLUCIÓN de 7 de febrero de 2023, del Servicio Territorial de Industria, Comercio y Economía de Valladolid, relativo a la autorización administrativa previa y autorización administrativa de construcción de una instalación de producción de energía eléctrica, por tecnología fotovoltaica, denominada «FV Renedo GZ»". BOLETÍN OFICIAL DE CASTILLA Y LEÓN. 2023-02-07. Archived from the original on 2024-04-09. Retrieved 2024-04-02.
  3. "Las empresas detrás de los 4 GW renovables menores a 50 MW en tramitación en Castilla y León". Energía Estratégica España. 2023-12-11. Archived from the original on 2024-04-15.