Riverstart Solar Park

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Riverstart Solar Park is an operating solar photovoltaic (PV) farm in Modoc, Randolph County, Indiana, United States.

Project Details

Table 1: Phase-level project details for Riverstart Solar Park

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Operating[1] 2021[1] 200 MWac[1] PV[1] EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [20%]; Connor Clark & Lunn Infrastructure [80%] (EDPR Ανανεωσιμες Πηγες Ενεργειας Ελλας 1 Μονοπροσωπη Ανωνυμη Εταιρεια)[2] EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship (EDPR Ανανεωσιμες Πηγες Ενεργειας Ελλας 1 Μονοπροσωπη Ανωνυμη Εταιρεια)[3]
3 Construction[4] 100 MWac[5] PV[5] EDPR Renewable Energy Sources of Greece 1 Sole Proprietorship [100%] (EDPR Ανανεωσιμες Πηγες Ενεργειας Ελλας 1 Μονοπροσωπη Ανωνυμη Εταιρεια)[6]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Riverstart Solar Park

Phase Name Location Coordinates (WGS 84)
1 Modoc, Randolph County, Indiana, United States[1] 40.0462, -85.0451 (exact)[1]
3 Randolph County, Indiana, United States[5] 40.0556, -85.1266 (exact)[5]

The map below shows the exact locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
  2. https://pv-magazine-usa.com/2022/01/03/edp-renewables-sells-stake-in-200-mw-solar-project-to-connor-clark-lunn/ https://pv-magazine-usa.com/2022/01/03/edp-renewables-sells-stake-in-200-mw-solar-project-to-connor-clark-lunn/, https://pv-magazine-usa.com/2022/01/03/edp-renewables-sells-stake-in-200-mw-solar-project-to-connor-clark-lunn/. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  3. (PDF) https://web.archive.org/web/20240206180911/https://www.edpr.com/north-america/sites/edprna/files/2021-10/IN%20Riverstart%20Fact%20Sheet%202021.pdf. Archived from the original (PDF) on 2024-02-06. {{cite web}}: Missing or empty |title= (help)
  4. https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx https://www.eia.gov/electricity/data/eia860/, https://www.eia.gov/electricity/data/eia860m/xls/november_generator2024.xlsx. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  5. 5.0 5.1 5.2 5.3 "U.S. Energy Information Administration, Form EIA-860 detailed data with previous form data (EIA-860A/860B), 2012". Archived from the original on 2022-10-28. Retrieved 2023-11-01 00:00:00. {{cite web}}: Check date values in: |access-date= (help)
  6. (PDF) https://web.archive.org/web/20240206203211/https://www.edpr.com/north-america/sites/edprna/files/2021-12/IN%20Riverstart%20III%20Fact%20Sheet%202021.pdf. Archived from the original (PDF) on 2024-02-06. {{cite web}}: Missing or empty |title= (help)