Roadrunner (Enel) solar farm
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Roadrunner (Enel) solar farm is an operating solar photovoltaic (PV) farm in Upton County, Texas, United States.
Project Details
Table 1: Phase-level project details for Roadrunner (Enel) solar farm
| Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
|---|---|---|---|---|---|---|
| 1 | Operating[1] | 2019[2] | 252 MWac[2] | PV[1] | Enel Green Power SpA [100%][2] | Enel Green Power[2] |
| 2 | Operating[1] | 2020[1] | 245 MWac[2] | PV[1] | Enel Green Power SpA [100%][2] | Enel Green Power[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Roadrunner (Enel) solar farm
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | Upton County, Texas, United States[1] | 31.2194, -102.1922 (exact)[1] |
| 2 | Upton County, Texas, United States[1] | 31.2194, -102.1922 (exact)[1] |
The map below shows the exact locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 "Preliminary Monthly Electric Generator Inventory (based on Form EIA-860M as a supplement to Form EIA-860) - U.S. Energy Information Administration (EIA)". www.eia.gov. Archived from the original on 2023-05-09. Retrieved 2025-01-06.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 https://web.archive.org/web/20240206181008/https://www.enelgreenpower.com/our-projects/highlights/roadrunner-solar-project. Archived from the original on 2024-02-06.
{{cite web}}: Missing or empty|title=(help)
