Rockmont Solar And Storage Project

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Rockmont Solar And Storage Project is a shelved solar photovoltaic (PV) farm in Kirtland, San Juan County, New Mexico, United States.

Project Details

Table 1: Phase-level project details for Rockmont Solar And Storage Project

Status Nameplate capacity Technology Owner Operator
Shelved[1] 100 MWac[2] PV[2] Avantus[3][4] Avantus[2][4]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Rockmont Solar And Storage Project

Location Coordinates (WGS 84)
Kirtland, San Juan County, New Mexico, United States[5] 36.7766, -108.3751 (approximate)[2]

The map below shows the approximate location of the solar farm:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. (PDF) https://www.nmlegis.gov/handouts/ALFC%20071823%20Item%203%20PNM's%20presentation%20to%20LFC%207-18-23%20Final.pdf. {{cite web}}: Missing or empty |title= (help)
  2. 2.0 2.1 2.2 2.3 "Preliminary Monthly Electric Generator Inventory - March". U.S. Energy Information Administration. May 24, 2022. Archived from the original on September, 28, 2022. Retrieved June 21, 2022. {{cite web}}: Check date values in: |archive-date= (help)
  3. https://pv-magazine-usa.com/2021/05/28/sunrise-brief-a-solar-storage-project-stumbles-and-a-utility-scrambles-for-capacity/. {{cite web}}: Missing or empty |title= (help)
  4. 4.0 4.1 https://www.pv-tech.org/us-developer-8minute-solar-energy-rebrands-as-avantus/. {{cite web}}: Missing or empty |title= (help)
  5. "Form EIA-860 detailed data with previous form data". US Energy Information Administration. September 5, 2020. Archived from the original on July 1, 2022. Retrieved July 21, 2022.