Rokan-Dumai Oil Pipeline
From Global Energy Monitor
| Part of the Global Oil Infrastructure Tracker, a Global Energy Monitor project. |
| Related categories: |
Rokan-Dumai Oil Pipeline is an operating oil pipeline in Indonesia.[1][2]
Location
The pipeline runs from the Rokan Block, Riau, on Sumatra, Indonesia to the Pertamina oil refinery in Dumai, Indonesia.[1]
Project Details
- Operator: Pertagas[1]
- Owner: PT Perusahaan Gas Negara (PGN)[1]
- Parent company: PT Perusahaan Gas Negara (PGN)[1]
- Capacity: 250,000 barrels per day[1]
- Length: 342 kilometer[3]
- Diameter:
- Status: Operating[1][4][2]
- Start year: 2022[4]
- Cost: US$300 million[4]
- Financing:
- Associated infrastructure:
Background
Construction of the pipeline began in July 2020.[1]
Construction was completed in December 2021, with a final length of 342 km. First oil was tested in January 2022.[3]
The pipeline commenced operations in November 2022.[2]
The pipeline is divided into two parts: the northern line, which connects the Balam - Bangko - Dumai Corridor and the southern line, which connects the Minas - Duri - Dumai Corridor.[3]
Articles and Resources
References
- ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 PGN commences 367-km crude oil pipeline construction in Rokan Block, Antara News, Jun. 19, 2020
- ↑ 2.0 2.1 2.2 https://ir.pgn.co.id/AssetFiles/Financial/Sustainability/laporan_keberlanjutan_2022.pdf
- ↑ 3.0 3.1 3.2 "trigunainternusa.com". www.trigunainternusa.com. Retrieved 2026-02-26.
- ↑ 4.0 4.1 4.2 "63.5 Kilometers Of Rokan Oil Pipe Coming Into Operation". VOI - Waktunya Merevolusi Pemberitaan. Retrieved 2022-02-13.
