Rubí 5 solar farm

From Global Energy Monitor
This article is part of the
Global Solar Power Tracker, a Global Energy Monitor project.
Report an error

Other names: Rubi V

Rubí 5 solar farm (Central Solar Rubí 5) is an announced solar photovoltaic (PV) farm in Moquegua, Peru.

Project Details

Table 1: Phase-level project details for Rubí 5 solar farm

Phase name Status Commissioning year Nameplate capacity Technology Owner Operator
1 Announced[1] 2025 (planned)[2] 331.7 MWp/dc[2] PV[2] Enel Green Power SpA [100%][2] Enel Perú[2]
2 Announced[1] 2026 (planned)[2] 331.7 MWp/dc[2] PV[2] Enel Green Power SpA [100%][2] Enel Perú[2]

Read more about Solar capacity ratings.

Location

Table 2: Phase-level location details for Rubí 5 solar farm

Phase Name Location Coordinates (WGS 84)
1 Moquegua, Moquegua, Peru[2] -17.2018, -70.9332 (approximate)[2]
2 Moquegua, Moquegua, Peru[2] -17.2018, -70.9332 (approximate)[2]

The map below shows the approximate locations of the solar farm phases:

Loading map...

Articles and Resources

Additional data

To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.

References

  1. 1.0 1.1 (PDF) https://www.osinergmin.gob.pe/seccion/centro_documental/electricidad/Documentos/Publicaciones/Compendio-Proyectos-CGENC-EPO-aprobados-COES.pdf https://www.osinergmin.gob.pe/seccion/centro_documental/electricidad/Documentos/Publicaciones/Compendio-Proyectos-CGENC-EPO-aprobados-COES.pdf, https://www.osinergmin.gob.pe/seccion/centro_documental/electricidad/Documentos/Publicaciones/Compendio-Proyectos-CGENC-EPO-aprobados-COES.pdf. {{cite web}}: Check |url= value (help); Missing or empty |title= (help)
  2. 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 DIVISIÓN DE SUPERVISIÓN DE ELECTRICIDAD (2024). "INFORMACIÓN TÉCNICA DE PROYECTOS DE CENTRALES DE GENERACIÓN DE ENERGÍA ELÉCTRICA NO CONVENCIONAL CON ESTUDIOS DE PRE OPERATIVIDAD APROBADOS POR EL COES" (PDF). Archived from the original (PDF) on 2022-07-27.