Rubí 5 solar farm
From Global Energy Monitor
This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
Other names: Rubi V
Rubí 5 solar farm (Central Solar Rubí 5) is an announced solar photovoltaic (PV) farm in Moquegua, Peru.
Project Details
Table 1: Phase-level project details for Rubí 5 solar farm
Phase name | Status | Commissioning year | Nameplate capacity | Technology | Owner | Operator |
---|---|---|---|---|---|---|
1 | Announced[1] | 2025 (planned)[2] | 331.7 MWp/dc[2] | PV[2] | Enel Green Power SpA [100%][2] | Enel Perú[2] |
2 | Announced[1] | 2026 (planned)[2] | 331.7 MWp/dc[2] | PV[2] | Enel Green Power SpA [100%][2] | Enel Perú[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for Rubí 5 solar farm
Phase Name | Location | Coordinates (WGS 84) |
---|---|---|
1 | Moquegua, Moquegua, Peru[2] | -17.2018, -70.9332 (approximate)[2] |
2 | Moquegua, Moquegua, Peru[2] | -17.2018, -70.9332 (approximate)[2] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.0 1.1 (PDF) https://www.osinergmin.gob.pe/seccion/centro_documental/electricidad/Documentos/Publicaciones/Compendio-Proyectos-CGENC-EPO-aprobados-COES.pdf https://www.osinergmin.gob.pe/seccion/centro_documental/electricidad/Documentos/Publicaciones/Compendio-Proyectos-CGENC-EPO-aprobados-COES.pdf, https://www.osinergmin.gob.pe/seccion/centro_documental/electricidad/Documentos/Publicaciones/Compendio-Proyectos-CGENC-EPO-aprobados-COES.pdf.
{{cite web}}
: Check|url=
value (help); Missing or empty|title=
(help) - ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 DIVISIÓN DE SUPERVISIÓN DE ELECTRICIDAD (2024). "INFORMACIÓN TÉCNICA DE PROYECTOS DE CENTRALES DE GENERACIÓN DE ENERGÍA ELÉCTRICA NO CONVENCIONAL CON ESTUDIOS DE PRE OPERATIVIDAD APROBADOS POR EL COES" (PDF). Archived from the original (PDF) on 2022-07-27.