São Gotardo Cooperativa Origo Geracao Distribuida solar project
From Global Energy Monitor
| This article is part of the Global Solar Power Tracker, a Global Energy Monitor project. |
São Gotardo Cooperativa Origo Geracao Distribuida solar project is an operating solar photovoltaic (PV) farm in São Gotardo, Minas Gerais, Brazil.
Project Details
Table 1: Phase-level project details for São Gotardo Cooperativa Origo Geracao Distribuida solar project
| Phase name | Status | Commissioning year | Nameplate capacity | Technology |
|---|---|---|---|---|
| 1 | Operating[1] | 2024[1] | 2.5 MW[1] | PV[2] |
| 1A | Operating[2] | 2023[2] | 2.5 MW[2] | PV[2] |
| 2 | Operating[1] | 2024[1] | 2.5 MW[1] | PV[2] |
| 3 | Operating[1] | 2024[1] | 2.5 MW[1] | PV[2] |
Read more about Solar capacity ratings.
Location
Table 2: Phase-level location details for São Gotardo Cooperativa Origo Geracao Distribuida solar project
| Phase Name | Location | Coordinates (WGS 84) |
|---|---|---|
| 1 | São Gotardo, Minas Gerais, Brazil[1] | -19.3169, -46.0477 (approximate)[1] |
| 1A | São Gotardo, Minas Gerais, Brazil[2] | -19.3400, -46.0500 (approximate)[2] |
| 2 | São Gotardo, Minas Gerais, Brazil[1] | -19.3169, -46.0477 (approximate)[1] |
| 3 | São Gotardo, Minas Gerais, Brazil[1] | -19.3169, -46.0477 (approximate)[1] |
The map below shows the approximate locations of the solar farm phases:
Articles and Resources
Additional data
To access additional data, including an interactive map of global solar farms, a downloadable dataset, and summary data, please visit the Global Solar Power Tracker on the Global Energy Monitor website.
References
- ↑ 1.00 1.01 1.02 1.03 1.04 1.05 1.06 1.07 1.08 1.09 1.10 1.11 1.12 1.13 1.14 "SIGA - Sistema de Informações de Geração da ANEEL". Dados Abertos. 2025-01-06. Archived from the original on 2025-01-06. Retrieved 2025-01-06.
- ↑ 2.0 2.1 2.2 2.3 2.4 2.5 2.6 2.7 2.8 https://dados.gov.br/dados/conjuntos-dados/relacao-de-empreendimentos-de-geracao-distribuida.
{{cite web}}: Missing or empty|title=(help)