São Mateus power station (Usina termelétrica São Mateus) is a power station in pre-construction in São Mateus, Espírito Santo, Brazil.

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
São Mateus power station São Mateus, Espírito Santo, Brazil -18.735145, -39.85951 (approximate)[1][2]
Loading map...


Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology Start year Emergency/Backup
I Pre-construction[1][3] fossil gas: natural gas[1] 41.2[1] unknown 2028 (planned)[1][3] no
II Pre-construction[1][3] fossil gas: natural gas[1] 41.2[1] unknown 2028 (planned)[1][3] no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Operator Owner Parent
I Consórcio São Mateus I; Consórcio São Mateus II[3][3] Urca Comercializadora de Energia Ltda [25%]; BYK Participações SA [75%][3][3] BYK Participações SA [75.0%]; Urca Energia Participacoes Ltd [25.0%]
II Consórcio São Mateus I; Consórcio São Mateus II[3][3] Urca Comercializadora de Energia Ltda [25%]; BYK Participações SA [75%][3][3] BYK Participações SA [75.0%]; Urca Energia Participacoes Ltd [25.0%]

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 https://www.ccee.org.br/documents/80415/31088149/resultado_vendedor_4LRCAP.pdf/81fc4d77-2d85-6628-48b2-19560c937920. {{cite web}}: Missing or empty |title= (help)
  2. ↑ https://tconline.com.br/empresa-projeta-termoeletricas-a-gas-com-capacidade-somada-de-624-mw-em-sao-mateus/. {{cite web}}: Missing or empty |title= (help)
  3. ↑ 3.00 3.01 3.02 3.03 3.04 3.05 3.06 3.07 3.08 3.09 3.10 3.11 https://leis.org/aneel/lei/despacho/2026/1848/despacho-n-1848-2026-decide-habilitar-as-proponentes-selecionadas-na-fase-de-lances-do-leilao-a-partir-de-empreendimentos-termeletricos-novos-rel. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.