SPIC Qinghai Hainan Prefecture Gobi Energy Base supporting coal fired power project
From Global Energy Monitor
Part of the Global Coal Plant Tracker, a Global Energy Monitor project. |
Related coal trackers: |
SPIC Qinghai Hainan Prefecture Gobi Energy Base supporting coal fired power project (国家电投青海省海南州戈壁基地配套4×66万千瓦煤电项目) is a power station in the pre-permit stage in Huangzhong District, Xining, Qinghai, China.
Location
Table 1: Project-level location details
Plant name | Location | Coordinates (WGS 84) |
---|---|---|
SPIC Qinghai Hainan Prefecture Gobi Energy Base supporting coal fired power project | Huangzhong District, Xining, Qinghai, China | 36.528355, 101.488207 (approximate) |
Project Details
Table 2: Unit-level details
Unit name | Status | Fuel(s) | Capacity (MW) | Technology |
---|---|---|---|---|
Unit 1 | Pre-permit | coal: bituminous | 660 | ultra-supercritical |
Unit 2 | Pre-permit | coal: bituminous | 660 | ultra-supercritical |
Unit 3 | Pre-permit | coal: bituminous | 660 | ultra-supercritical |
Unit 4 | Pre-permit | coal: bituminous | 660 | ultra-supercritical |
Table 3: Unit-level ownership and operator details
Unit name | Owner | Parent |
---|---|---|
Unit 1 | SPIC Yellow River Upstream Hydropower Development Co Ltd | SPIC Yellow River Upstream Hydropower Development Co Ltd |
Unit 2 | SPIC Yellow River Upstream Hydropower Development Co Ltd | SPIC Yellow River Upstream Hydropower Development Co Ltd |
Unit 3 | SPIC Yellow River Upstream Hydropower Development Co Ltd | SPIC Yellow River Upstream Hydropower Development Co Ltd |
Unit 4 | SPIC Yellow River Upstream Hydropower Development Co Ltd | SPIC Yellow River Upstream Hydropower Development Co Ltd |
Background
A meeting to review the project feasibility study report took place in June 2024[1]. Notices for the project's environmental impact assessment (EIA)[2] and social stability risk assessment[3] were also issued in 2024.
Biddings for the project were called throughout 2025[4][5].
Articles and Resources
References
- ↑ 左东宇 (2024-06-19). "青海省海南州戈壁基地配套煤电项目可行性研究报告评审会召开". 黄河上游水电开发有限公司网站. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "青海省海南州戈壁基地配套煤电项目环境影响评价一次公示". 环保信息公示网. 2024-07-11. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "社会稳定风险评估公示". 西宁市发展和改革委员会网站. 2024-10-22. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "4×66万千瓦!青海海南州戈壁基地配套煤电项目申请报告编制技术服务招标". 北极星火力发电网. 2025-02-24. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link) - ↑ "国家电投4×660MW煤电项目初步设计(含勘察)和设计咨询(业主工程师)招标". 北极星火力发电网. 2025-09-03. Retrieved 2025-9-4.
{{cite web}}
: Check date values in:|access-date=
(help)CS1 maint: url-status (link)
Additional data
To access additional data, including an interactive map of coal-fired power stations, a downloadable dataset, and summary data, please visit the Global Coal Plant Tracker on the Global Energy Monitor website.