Sabine Crossing Gas Pipeline

From Global Energy Monitor
Part of the
Global Gas Infrastructure Tracker,
a Global Energy Monitor project.
Download full dataset
Report an error

Sabine Crossing Gas Pipeline is a proposed gas pipeline in Texas and Louisiana, United States.[1]

Location

The pipeline would run from Jefferson County, TX to the Sabine Pass LNG Terminal, LA.[1]

Project Details

  • Operator: Sabine Crossing, LLC[1]
  • Owner: Cheniere Energy[1]
  • Capacity: 2700 MMcf/d[1]
  • Length: 55.6 mi[1]
  • Diameter: 48 in[1]
  • Status: Proposed[1]
  • Start year: 2031[1]

Background

In February 2024, Sabine Crossing applied for FERC approval. They withdrew the original application a month later in order to optimize and improve the pipeline route before re-applying.[1]

Articles and resources

References

  1. 1.0 1.1 1.2 1.3 1.4 1.5 1.6 1.7 1.8 1.9 "Natural Gas - Pipeline Projects". eia.gov. 2025-07-01. Retrieved 2025-09-18.{{cite web}}: CS1 maint: url-status (link)