Sabiya power plant (محطة الصبية لتوليد الطاقة وتقطير المياه) is an operating power station of at least 7053-megawatts (MW) in Subiya, Jahra, Kuwait with multiple units, some of which are not currently operating. It is also known as SBOC 2 (Units 2-GT1, 2-GT2, 2-GT3, 2-GT4), SBCC 5 (Unit CC5), SBOC 8 (Unit SBOC-8), SBCC 3 (Units 4-GT1, 4-GT2, 4-ST1), SBCC 1 (Units CC1-1, CC1-2, CC1-3), SBCC 4 (Unit CC4).

Location

Table 1: Project-level location details

Plant name Location Coordinates (WGS 84)
Sabiya power plant Subiya, Jahra, Kuwait 29.564206, 48.170653 (exact)[1][2][3][4]
Loading map...

Unit-level coordinates (WGS 84):

  • 2-GT1, 2-GT2, 2-GT3, 2-GT4, 4-GT1, 4-GT2, 4-ST1, CC1-1, CC1-2, CC1-3, CC4-توسعة محطة الصبية (المرحلة الرابعة), CC5, GT1- SBOC-2, GT2- SBOC-2, GT3- SBOC-2, GT4- SBOC-2, GT5- SBOC-2, GT6- SBOC-2, SBOC-8, ST1, ST2, ST3, ST4, ST5, ST6, ST7, ST8: 29.564206, 48.170653

Project Details

Table 2: Unit-level details

Unit name Status Fuel(s) Capacity (MW) Technology CHP Start year Equipment Emergency/Backup
2-GT1 Operating[5] fossil gas: natural gas[5][6] 62.5[5] gas turbine[5] not found 2009[5] not found no
2-GT2 Operating[5] fossil gas: natural gas[5][6] 62.5[5] gas turbine[5] not found 2009[5] not found no
2-GT3 Operating[5] fossil gas: natural gas[5][6] 62.5[5] gas turbine[5] not found 2009[5] – no
2-GT4 Operating[5] fossil gas: natural gas[5][6] 62.5[5] gas turbine[5] not found 2009[5] not found no
4-GT1 Operating[7] fossil gas: natural gas[5][6] 250[5] gas turbine[5][8] not found 2016[5] not found no
4-GT2 Operating[5] fossil gas: natural gas[5][6] 250[5] gas turbine[5][8] not found 2016[5] not found no
4-ST1 Construction[9][10] fossil gas: waste heat from natural gas[10][11] 250[11] steam turbine[5][8] not found – not found no
CC1-1 Operating[7] fossil gas: natural gas[5][6] 656[7] combined cycle[5] not found 2012[5][1] GE Power: 9FA, GE Power: 9FA, GE Power: D11[12] no
CC1-2 Operating[7] fossil gas: natural gas[5][6] 656[7] combined cycle[5] not found 2012[5][1] GE Power: 9FA, GE Power: 9FA, GE Power: D11[12] no
CC1-3 Operating[7] fossil gas: natural gas[5][6] 656[7] combined cycle[5] not found 2012[5][1] GE Power: 9FA, GE Power: 9FA, GE Power: D11[12] no
CC4-توسعة محطة الصبية (المرحلة الرابعة) Construction[9][13][14][15][10][2][16] fossil gas: natural gas[2] 900[2] combined cycle[2] not found 2028 (planned)[17][18][14] not found no
CC5 Operating[7][19] fossil gas: natural gas, fossil liquids: fuel oil[19] 935[7][20] combined cycle[19] not found 2020[7][19] Siemens Energy: SGen5-2000H, Siemens Energy: SST5-5000, Siemens Energy: SGT5-4000F, Siemens Energy: SGT5-4000F, Siemens Energy: SGen5-2000H, Siemens Energy: SGen5-2000H[20] no
GT1- SBOC-2 Operating[5] fossil gas: natural gas[5][6] 41.7[5][21] gas turbine[5] not found 2008[5][21] GE Vernova: LM6000[22] no
GT2- SBOC-2 Operating[5] fossil gas: natural gas[5][6] 41.7[5][21] gas turbine[5] not found 2008[5][21] GE Vernova: LM6000[22] no
GT3- SBOC-2 Operating[5] fossil gas: natural gas[5][6] 41.7[5][21] gas turbine[5] not found 2008[5][21] GE Vernova: LM6000[22] no
GT4- SBOC-2 Operating[5] fossil gas: natural gas[5][6] 41.7[5][21] gas turbine[5] not found 2008[5][21] GE Vernova: LM6000[22] no
GT5- SBOC-2 Operating[5] fossil gas: natural gas[5][6] 41.7[5][21] gas turbine[5] not found 2008[5][21] GE Vernova: LM6000[22] no
GT6- SBOC-2 Operating[5] fossil gas: natural gas[5][6] 41.7[5][21] gas turbine[5] not found 2008[5][21] GE Vernova: LM6000[22] no
SBOC-8 Operating[5] fossil gas: natural gas[5][6] 750[5] combined cycle[5] not found 2019[5] Siemens Energy: SST5-5000, Siemens Energy: STG5-4000F, Siemens Energy: STG5-4000F[8] no
ST1 Operating[5] fossil gas: natural gas, fossil liquids: fuel oil, fossil liquids: crude oil[23] 300[24][5] steam turbine[5] yes[25] 1998[5] not found no
ST2 Operating[5] fossil gas: natural gas, fossil liquids: fuel oil, fossil liquids: crude oil[23] 300[24][5] steam turbine[5] yes[25] 1998[5] not found no
ST3 Operating[5] fossil gas: natural gas, fossil liquids: fuel oil, fossil liquids: crude oil[23] 300[24][5] steam turbine[5] yes[25] 1999[5] not found no
ST4 Operating[5] fossil gas: natural gas, fossil liquids: fuel oil, fossil liquids: crude oil[23] 300[24][5] steam turbine[5] yes[25] 1999[5] not found no
ST5 Operating[5] fossil gas: natural gas, fossil liquids: fuel oil, fossil liquids: crude oil[23] 300[24][5] steam turbine[5] yes[25] 1999[5] not found no
ST6 Operating[5] fossil gas: natural gas, fossil liquids: fuel oil, fossil liquids: crude oil[23] 300[24][5] steam turbine[5] yes[25] 2000[5] not found no
ST7 Operating[5] fossil gas: natural gas, fossil liquids: fuel oil, fossil liquids: crude oil[23] 300[24][5] steam turbine[5] yes[25] 2000[5] not found no
ST8 Operating[5] fossil gas: natural gas, fossil liquids: fuel oil, fossil liquids: crude oil[23] 300[24][5] steam turbine[5] yes[25] 2000[5] not found no

CHP is an abbreviation for Combined Heat and Power. It is a technology that produces electricity and thermal energy at high efficiencies. Coal units track this information in the Captive Use section when known.

Table 3: Unit-level ownership and operator details

Unit name Owner Parent
2-GT1 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
2-GT2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
2-GT3 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
2-GT4 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
4-GT1 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
4-GT2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
4-ST1 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
CC1-1 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
CC1-2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
CC1-3 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
CC4-توسعة محطة الصبية (المرحلة الرابعة) Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
CC5 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
GT1- SBOC-2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
GT2- SBOC-2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
GT3- SBOC-2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
GT4- SBOC-2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
GT5- SBOC-2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
GT6- SBOC-2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
SBOC-8 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
ST1 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
ST2 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
ST3 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
ST4 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
ST5 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
ST6 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
ST7 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]
ST8 Ministry of Electricity and Water and Renewable Energy (Kuwait) [100%][5][7][10][2][19] Ministry of Electricity and Water and Renewable Energy (Kuwait) [100.0%]

Project-level captive use details

  • Captive industry use (heat or power): power[26]
  • Captive industry: Chemicals[26]
  • Non-industry use: power[26]


Ownership Tree

This ownership tree is part of the Global Energy Ownership Tracker, a project of Global Energy Monitor.

Articles and Resources

References

  1. ↑ 1.0 1.1 1.2 1.3 https://web.archive.org/web/20220628011052/https://www.falghanim.com/business-spectrum/power/sabiya-ccgt/. Archived from the original on 2022-06-28. {{cite web}}: Missing or empty |title= (help)
  2. ↑ 2.00 2.01 2.02 2.03 2.04 2.05 2.06 2.07 2.08 2.09 2.10 2.11 2.12 2.13 2.14 2.15 2.16 2.17 2.18 2.19 2.20 2.21 2.22 2.23 2.24 2.25 2.26 2.27 2.28 2.29 2.30 2.31 https://web.archive.org/web/20220615000201/https://www.alanba.com.kw/1114443. Archived from the original on 2022-06-15. {{cite web}}: Missing or empty |title= (help)
  3. ↑ https://www.google.com/maps/place/Subiya+Thermal+Power+Plant/@29.5652994,48.1668145,15z/data=!4m5!3m4!1s0x3fcf7def7d460ae5:0xec45c1d11781f3ce!8m2!3d29.5652884!4d48.1672482. {{cite web}}: Missing or empty |title= (help)
  4. ↑ https://web.archive.org/web/20201224204104/https://reconnectingasia.csis.org/database/powerplants/sabiya-combined-cycle-power-plant/. Archived from the original on 2020-12-24. {{cite web}}: Missing or empty |title= (help)
  5. ↑ 5.000 5.001 5.002 5.003 5.004 5.005 5.006 5.007 5.008 5.009 5.010 5.011 5.012 5.013 5.014 5.015 5.016 5.017 5.018 5.019 5.020 5.021 5.022 5.023 5.024 5.025 5.026 5.027 5.028 5.029 5.030 5.031 5.032 5.033 5.034 5.035 5.036 5.037 5.038 5.039 5.040 5.041 5.042 5.043 5.044 5.045 5.046 5.047 5.048 5.049 5.050 5.051 5.052 5.053 5.054 5.055 5.056 5.057 5.058 5.059 5.060 5.061 5.062 5.063 5.064 5.065 5.066 5.067 5.068 5.069 5.070 5.071 5.072 5.073 5.074 5.075 5.076 5.077 5.078 5.079 5.080 5.081 5.082 5.083 5.084 5.085 5.086 5.087 5.088 5.089 5.090 5.091 5.092 5.093 5.094 5.095 5.096 5.097 5.098 5.099 5.100 5.101 5.102 5.103 5.104 5.105 5.106 5.107 5.108 5.109 5.110 5.111 5.112 5.113 5.114 5.115 5.116 5.117 5.118 5.119 5.120 5.121 5.122 5.123 5.124 5.125 5.126 5.127 5.128 5.129 5.130 5.131 5.132 (PDF) https://web.archive.org/web/20210712194917/https://www.mew.gov.kw/media/vx4bl5zu/%D9%83%D8%AA%D8%A7%D8%A8-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A6%D9%8A%D8%A9-2019.pdf. Archived from the original (PDF) on 2021-07-12. {{cite web}}: Missing or empty |title= (help)
  6. ↑ 6.00 6.01 6.02 6.03 6.04 6.05 6.06 6.07 6.08 6.09 6.10 6.11 6.12 6.13 6.14 6.15 https://web.archive.org/web/20211009061140/http://www.kapp.gov.kw/Admin/DynamicFile.aspx?PHName=DownloadFile&PageID=1089&Published=1. Archived from the original on 2021-10-09. {{cite web}}: Missing or empty |title= (help)
  7. ↑ 7.00 7.01 7.02 7.03 7.04 7.05 7.06 7.07 7.08 7.09 7.10 7.11 7.12 7.13 7.14 7.15 7.16 7.17 7.18 7.19 7.20 7.21 7.22 7.23 7.24 7.25 7.26 7.27 7.28 7.29 7.30 7.31 7.32 7.33 7.34 7.35 7.36 (PDF) https://web.archive.org/web/20220711054936/https://www.mew.gov.kw/media/dm3dwvt0/%D9%83%D8%AA%D8%A7%D8%A8-%D8%A7%D9%84%D8%A7%D8%AD%D8%B5%D8%A7%D8%A1-%D8%A7%D9%84%D8%B3%D9%86%D9%88%D9%8A-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A1-compressed.pdf. Archived from the original (PDF) on 2022-07-11. {{cite web}}: Missing or empty |title= (help)
  8. ↑ 8.0 8.1 8.2 8.3 https://web.archive.org/web/20220627025759/https://www.lntsnl.com/our-services/detail-engineering/projects/750-mw-sabiya-3-ccgt-power-plant-kuwait/. Archived from the original on 2022-06-27. {{cite web}}: Missing or empty |title= (help)
  9. ↑ 9.0 9.1 https://www.argaam.com/ar/article/articledetail/id/1768660. {{cite web}}: Missing or empty |title= (help)
  10. ↑ 10.00 10.01 10.02 10.03 10.04 10.05 10.06 10.07 10.08 10.09 10.10 10.11 10.12 10.13 10.14 10.15 10.16 10.17 10.18 10.19 10.20 10.21 10.22 10.23 10.24 10.25 10.26 10.27 10.28 10.29 https://kuwaitpress.net/news/967371?kw=%D9%88%D8%B2%D9%8A%D8%B1-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A1-%D9%88%D8%A7%D9%84%D9%85%D8%A7%D8%A1-%D9%8A%D8%AA%D9%81%D9%82%D8%AF-%D9%85%D8%AD%D8%B7%D8%A9-%D8%A7%D9%84%D8%AF%D9%88%D8%AD%D8%A9-%D8%A7%D9%84%D8%B4%D8%B1%D9%82%D9%8A%D8%A9. {{cite web}}: Missing or empty |title= (help)
  11. ↑ 11.0 11.1 (PDF) https://web.archive.org/web/20221208190059/https://www.mew.gov.kw/media/av5dglm5/%D9%83%D8%AA%D8%A7%D8%A8-%D8%A7%D9%84%D8%A7%D8%AD%D8%B5%D8%A7%D8%A1-%D8%A7%D9%84%D8%B3%D9%86%D9%88%D9%8A-%D8%A7%D9%84%D8%B7%D8%A7%D9%82%D8%A9-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A6%D9%8A%D8%A9-2021_compressed.pdf. Archived from the original (PDF) on 2022-12-08. {{cite web}}: Missing or empty |title= (help)
  12. ↑ 12.0 12.1 12.2 https://www.power-technology.com/data-insights/power-plant-profile-sabiya-combined-cycle-power-plant-kuwait/?cf-view. {{cite web}}: Missing or empty |title= (help)
  13. ↑ https://www.alsabahpress.com/first-page/2025-06-24/97702/. {{cite web}}: Missing or empty |title= (help)
  14. ↑ 14.0 14.1 https://web.archive.org/web/20230517182949/https://www.alanba.com.kw/1181781. Archived from the original on 2023-05-17. {{cite web}}: Missing or empty |title= (help)
  15. ↑ https://www.aljarida.com/article/126084. {{cite web}}: Missing or empty |title= (help)
  16. ↑ alseyassah.com (2023-09-11). "ترسية إنتاج 900 ميغاوات من محطة الصبية بـ257 مليون دينار". alseyassah.com. Archived from the original on 2024-05-08. Retrieved 2024-05-07.
  17. ↑ https://web.archive.org/web/20220711055140/https://www.mew.gov.kw/ar/NewsDetails?fromurl=news&&newsname=N_AUG03. Archived from the original on 2022-07-11. {{cite web}}: Missing or empty |title= (help)
  18. ↑ https://www.utilitybusinessmena.com/electricity/kuwait-to-expand-sabiya-power-plant-with-900mw-gas-turbines-amid-rising-demand. {{cite web}}: Missing or empty |title= (help)
  19. ↑ 19.00 19.01 19.02 19.03 19.04 19.05 19.06 19.07 19.08 19.09 19.10 19.11 19.12 19.13 19.14 19.15 19.16 19.17 19.18 19.19 19.20 19.21 19.22 19.23 19.24 19.25 19.26 19.27 19.28 19.29 19.30 https://web.archive.org/web/20220926060228/https://press.siemens.com/global/en/pressrelease/siemens-supply-power-train-sabiya-power-plant-kuwait. Archived from the original on 2022-09-26. {{cite web}}: Missing or empty |title= (help)
  20. ↑ 20.0 20.1 https://web.archive.org/web/20220628010038/https://www.falghanim.com/business-spectrum/power/sabiya-ccgt-3/. Archived from the original on 2022-06-28. {{cite web}}: Missing or empty |title= (help)
  21. ↑ 21.00 21.01 21.02 21.03 21.04 21.05 21.06 21.07 21.08 21.09 21.10 21.11 (PDF) https://www.mew.gov.kw/media/0fpnlm2h/electrical-annual-report-2022-for-qr.pdf. {{cite web}}: Missing or empty |title= (help)
  22. ↑ 22.0 22.1 22.2 22.3 22.4 22.5 https://www.falghanim.com/business-spectrum/power/sabiya-epp/. {{cite web}}: Missing or empty |title= (help)
  23. ↑ 23.0 23.1 23.2 23.3 23.4 23.5 23.6 23.7 https://web.archive.org/web/20220512111929/https://github.com/wri/global-power-plant-database/blob/master/raw_source_files/AUE/Manual%20Of%20Power%20Stations2016.xls?raw=true. Archived from the original on 2022-05-12. {{cite web}}: Missing or empty |title= (help)
  24. ↑ 24.0 24.1 24.2 24.3 24.4 24.5 24.6 24.7 (PDF) https://web.archive.org/web/20220925054016/https://documents1.worldbank.org/curated/en/829201468051896096/pdf/530470ESW0MNA01Official0Use0Only191.pdf. Archived from the original (PDF) on 2022-09-25. {{cite web}}: Missing or empty |title= (help)
  25. ↑ 25.0 25.1 25.2 25.3 25.4 25.5 25.6 25.7 https://web.archive.org/web/20221220143511/https://www.intechopen.com/books/desalination-updates/cogeneration-power-desalting-plants-using-gas-turbine-combined-cycle. Archived from the original on 2022-12-20. {{cite web}}: Missing or empty |title= (help)
  26. ↑ 26.0 26.1 26.2 https://web.archive.org/web/20220709074911/https://www.alanba.com.kw/ar/economy-news/1061371/03-08-2021-%D9%85%D9%8A%D8%AF-%D8%A7%D9%84%D9%83%D9%88%D9%8A%D8%AA-%D8%AA%D8%AD%D9%82%D9%82-%D8%AA%D9%82%D8%AF%D9%85%D8%A7-%D9%83%D8%A8%D9%8A%D8%B1%D8%A7-%D8%A8%D9%85%D8%B4%D8%B1%D9%88%D8%B9-%D8%AA%D9%88%D8%B3%D8%B9%D8%A9-%D9%85%D8%AD%D8%B7%D8%A9-%D8%A7%D9%84%D8%B5%D8%A8%D9%8A%D8%A9-%D9%84%D8%AA%D9%88%D9%84%D9%8A%D8%AF-%D8%A7%D9%84%D9%83%D9%87%D8%B1%D8%A8%D8%A7%D8%A1/. Archived from the original on 2022-07-09. {{cite web}}: Missing or empty |title= (help)

Additional data

To access additional data, including an interactive map of gas-fired power stations, a downloadable dataset, and summary data, please visit the Global Oil and Gas Plant Tracker on the Global Energy Monitor website.