Sabz Ab-Tang Fanni-Shazand-Rey crude oil pipeline project

From Global Energy Monitor
This article is part of the Global Fossil Infrastructure Tracker, a project of Global Energy Monitor.
Sub-articles:

Sabz Ab-Tang Fanni-Shazand-Rey Crude Oil Pipeline, also known as Sabz-Ab Rey Crude Oil Pipeline, Sabz Ab-Rey Sour Crude Oil Pipeline, and خط انتقال نفت خام سبزآب- ری, is a crude oil pipeline under construction in Iran.[1]

Location

The pipeline starts at Sabz Ab and runs to outside of Tehran, Iran.[2]

Loading map...

Project Details

Pipeline 1 (Sabzab-Tang Fanni pipeline)

  • Operator: National Iranian Oil Engineering & Construction Co.[3]
  • Owner: National Iranian Oil Company (NIOC)[4]
  • Parent company: Iran Ministry of Petroleum
  • Capacity: 450,000 bpd[3][5]
  • Length: 120 kilometers[4][6]
  • Diameter: 30 inches[3][4]
  • Status: Construction[7][6]
  • Start year:
  • Financing: US$400 Million
  • Associated Projects: Dezful northern fields, Imam Khomeini refinery, Sabzab pumping station, Tangfanni pumping station, Asar pumping station, Pol Baba pumping station, Razan pumping station, and Shazand pumping station

Pipeline 2 (Tang Fanni-Shazand Pipeline)

  • Operator: National Iranian Oil Engineering & Construction Co.[3]
  • Owner: National Iranian Oil Company (NIOC)[4]
  • Parent company: Iran Ministry of Petroleum
  • Capacity: 295,000 bpd[3]
  • Length: 239km[4][6]
  • Diameter: 26 inches[3][4]
  • Status: Construction[7][6]
  • Start year:
  • Financing:
  • Associated Projects: Dezful northern fields, Imam Khomeini refinery, Sabzab pumping station, Tangfanni pumping station, Asar pumping station, Pol Baba pumping station, Razan pumping station, and Shazand pumping station.

Pipeline 3 (Tang Shazand-Rey pipeline)

  • Operator: National Iranian Oil Engineering & Construction Co.[3]
  • Owner: National Iranian Oil Company (NIOC)[4]
  • Parent company: Iran Ministry of Petroleum
  • Capacity: 105,000 bpd[3][4]
  • Length: 279 kilometers[4][6]
  • Diameter: 18 inches[3][4]
  • Status: Construction[7][6][4]
  • Start year:
  • Financing:
  • Associated Projects: Dezful northern fields, Imam Khomeini refinery, Sabzab pumping station, Tangfanni pumping station, Asar pumping station, Pol Baba pumping station, Razan pumping station, and Shazand pumping station.

Background

Articles and resources

References

  1. "Sabzab-Rey sour crude oil pipeline – Farab". www.farab.com. Retrieved 2020-08-04.
  2. National Iranian Oil Engineering & Construction Co. "NIOEC Google Maps List". NIOEC. Retrieved August 4, 2020.{{cite web}}: CS1 maint: url-status (link)
  3. 3.0 3.1 3.2 3.3 3.4 3.5 3.6 3.7 3.8 National Iranian Oil Engineering and Construction Co. "Sabz Ab-Tang Fanni-Shazand-Rey Sour crude pipeline project". NIOEC. Retrieved August 4, 2020.{{cite web}}: CS1 maint: url-status (link)
  4. 4.00 4.01 4.02 4.03 4.04 4.05 4.06 4.07 4.08 4.09 4.10 National Iranian Oil Engineering and Construction Co. "Sabz Ab-Tang Fanni-Shazand-Rey Sour crude pipeline project". NIOEC. Retrieved August 4, 2020.{{cite web}}: CS1 maint: url-status (link)
  5. "Sabzab-Rey sour crude oil pipeline – Farab". www.farab.com. Retrieved 2023-03-10.
  6. 6.0 6.1 6.2 6.3 6.4 6.5 "اطلاعات پروژه". Farab.com. Retrieved August 7 2020. {{cite web}}: Check date values in: |access-date= (help)CS1 maint: url-status (link)
  7. 7.0 7.1 7.2 "Sabzab-Rey sour crude oil pipeline – Farab". www.farab.com. Retrieved 2020-08-04.

Related GEM.wiki articles

External resources

External articles